James Callahan
                                                         Superintendent


           EDUCATION                                                                REFERENCES
           Wentworth Institute of                                                   Warren Fairbanks
           Technology,                                                              Associate VP, Facilities and Capital
                                                                                    Planning
           BSc Building Construction
                                                                                    Framingham State University
                                                                                    508.626.4590
           LICENSES
           Commonwealth of                                                          Jim Hoffman
           Massachusetts Construction                                               Construction Admin
           Supervisor License                                                       Ellenzweig
                                                                                    617.575.7699
           SPECIAL TRAINING
           OSHA 30-Hour Training

           YEARS OF EXPERIENCE
           34




          James has served as a superintendent for most of his 30+ years in the fi eld. It’s a position he takes very seriously, knowing
          that he is responsible for both representing Barr & Barr and getting the best possible result for you as the owner. You will
          be welcome to approach him at any time, for any reason, from start to fi nish. And when you do, his commitment to your
          best interests will be apparent. James is a stickler for a neat, orderly building site - which is appreciated by workers and
          visitors alike.

          SIMILAR PROJECTS
          Warren Towers                                          Occupied Academic Building Renovation & Upgrades
          Boston University, Boston, MA (Warren Towers)          MIT PDSI, Cambridge, MA
          924,000 SF. Th  is fast track summer schedule spanned across three  200,000 SF.   Th  is project included renovations to the existing
          – 14 story tower dorm rooms.  Scope of work included life safety  building, connectors, and systems while maintaining active labs and
          upgrades, new fi re alarm systems and the installation of a sprinkler  classrooms.  Additionally this project included a new six story atrium.
          system throughout all three towers.
                                                                 New Science Building
          Academic Building Renovation & Expansion               Bentley College, Waltham, MA
          Framingham State University (DCAMM), Framingham, MA    50,0000 SF.  New Four story science building. Th  is facility was
          188,000 SF, LEED Silver. Th  e academic facility upgrade includes a   constructed on the side of a hill which required a 30’ cut ledge in order
          four-story addition that houses 16 teaching laboratories, including   to level the land for the building. Th  e new science building was equipped
          related prep and supply spaces, plus faculty research spaces, joined to   with teaching labs, classrooms, lecture halls and administrative offi  ces.
          the existing facility by a four-story atrium space. Selective interior
          renovations in the existing Hemenway Hall and the Annex provide   Occupied Academic Building Exterior Renovation
          a fully accessible, substantially improved teaching environment.
                                                                 MIT, Building E38, Cambridge, MA
          Dept. of Mechanical Engineering Renovations            35,000 SF.  Exterior renovation of existing cast in place structure.
          Massachusetts Institute of Technology, Cambridge, MA   Th  e existing building required the restoration of concrete and
          70,000 SF. Building 31 Renovations to the Departments of  reinforcement of steel.  Th  e installation of new windows , HVAC
          Mechanical Engineering and Aeronautics & Astronautics will  systems, and a roof – all working in and around an occupied building.
          include the creation of more contiguous offi  ce and departmental
          space, a two-story fl ying robotics lab, a new emergency generator, new
          elevators, improved pedestrian circulation, insulation of lab space,
          new HVAC and electrical equipment and infrastructure upgrades
          to meet code, safety and fi re protection requirements. Expansion
          will include new mezzanines and an addition on top of the High
          Bay area in order to meet the Departments’ programmatic needs.
          Occupied Academic Building Renovation & Upgrades
          Harvard University Planning & Real Estate, Cambridge, MA
          45,000 SF.  Kitchen and bathroom upgrades along with miscellaneous
          renovations to the existing 80 unit graduate student housing
          building, Terry Terrace.