Michael Gardner
Assistant Project Manager
EDUCATION REFERENCES
Wentworth Institute of Technology Thomas M. Quinn
BS Construction Management MIT – Facilities Manager
617.253.6715
SPECIAL TRAINING
OSHA 30-Hour Training Anthony Petrozzelli
Electrical Engineer
YEARS OF EXPERIENCE
WSP Flack and Kurtz
8
617.210.1625
YEARS WITH BARR & BARR
4
Mike will provide support to the fi eld staff , design team, owners and sub-contractors. He will handle the day to day
paperwork such as RFI’s, Change Directives, fi eld questions and communications between parties ensuring that documents
are distributed to all parties for resolution and or information as well as fi ling all information for record.
SIMILAR PROJECTS
Occupied Academic Building Renovation Occupied Academic Building Renovation
MIT E17, E18, E19 Renovations, Cambridge, MA MIT E25 3rd Floor, Cambridge, MA
80,903 SF. Complex of existing six and 7-story buildings that 17,000 SF. Gut of an existing laboratory and retrofi t of the Institute
house a mix of classroom, shop, offi ce,laboratory and vivarium for Medical Engineering & Science (IMES) headquarters. Program
space. Goal of project was to renovate entire second,third and consists of 20 offi ces, conference space, a kitchenette, innovation
fourth fl oors of Bldg. E17/18, part of the fi rst fl oor of E17, and space, HVAC and electrical upgrades, and two wet & two dry labs
parts of the second, sixth and seventh fl oors of E19 for new users. featuring new casework, fume hoods and biosafety cabinets.
New space is generally offi ce with some used as classroom space.
Involvement commenced during pre-construction phase for design Dept. of Mechanical Engineering Renovations
constructability and best practices, recommendations for alternate Massachusetts Institute of Technology, Cambridge, MA
materials to reduce costs with shorter lead times. Involved in V/E 70,000 SF. Building 31 Renovations to the Departments of Mechanical
process; provided SD/DD/GMP @ CD estimates; scheduling
& logistics planning, procurement schedules; sub-contractor bid Engineering and Aeronautics & Astronautics will include the
creation of more contiguous offi ce and departmental space, a two-
packages & award recommendations to client. Selective demo story fl ying robotics lab, a new emergency generator, new elevators,
required and related repairs for investigation.
improved pedestrian circulation, insulation of lab space, new HVAC
and electrical equipment and infrastructure upgrades to meet code,
Occupied Academic Building Renovation
safety and fi re protection requirements. Expansion will include new
MIT Wong Auditorium, Cambridge, MA mezzanines and an addition on top of the High Bay area in order to
108,000 SF. Auditorium renovation in 4-story fully occupied meet the Departments’ programmatic needs.
building; Auditorium capacity increased to 291 seats with ADA
accessible entries within existing fl oor plan. Renovation included
new ceilings, lighting system, new seating plan and stairways,
fl ooring, rails, a/v system.
Occupied Academic Building Renovation
MIT E17 Atlas Center, Cambridge, MA
25,000 SF. Th e Atlas Service Center was created as a gateway to
MIT’s goal to streamline administrative systems and processes while
making the campus experience more welcoming for students and
faculty. Th e purpose was to create an online service nexus with
systems, tools, information and resources that aligns service delivery
in a one-stop shop experience and consolidates many activities and
services in one location. Services are rendered via customer service
reps and self-service kiosks collaborating space and technology with
people, technology and space. Th e Atlas Service Center initiative
is focus on identifying both one-time and everyday needs-such as on
boarding and orientation, parking and commuter services, ID cards,
I9 processes, tech cash, in-person payroll and benefi ts transactions.