University of South Florida
South Pavilion at Tampa General, Tampa, FL
Relevant Team Experience
SIZE SCHEDULE OWNER ARCHITECT
126,082 Square Feet 15 months USF Health HKS Architects - Core / Shell
Parking - Utilized New Valet
Parking Garage at Tampa COMPLETION DATE REFERENCE Alfonso Architects - Tenant
General Hospital 2008 Fell Stubbs Improvement
813.974.3298
CONSTRUCTION COST CONTRACT TYPE TEAM MEMBERS
$23.6 Million Construction Management Fred Hames
Core/Shell/ Matt Gilbert
Tenant Improvement
PROJECT DETAILS
Th is new seven-story, 126,000-SF medical offi ce building (MOB) for • Th e aspects of the project include an imaging
the University of South Florida was constructed at the Tampa General suite, exams rooms and staff offi ces
Hospital (TGH) campus on an existing valet parking lot area.
• Th e second, third, and fourth fl oors of the MOB
are exam rooms, staff work rooms and waiting
Th e MOB shell construction consisted of a structural steel frame with
rooms
metal stud, densglass and stucco exterior. Th e lobby contains the elevator
vestibule, restroom areas and mechanical and electrical spaces. Th e balance • Th e fi fth, sixth and seventh fl oors consist of staff
of the space on the fi rst fl oor is lease space to be completed during the offi ces for the new MOB.
interior build-out phase of the project. Th e construction of the interior
spaces for this project consist of completing the common and corridor spaces
on fl oors two through seven. At the lease spaces, the shell construction
will provide the necessary utility stubs for future build-out. Th e MOB
tenant build-out construction consists of a multi-phased single tenant
fi t-out for USF Health. Th e imaging suite on the fi rst fl oor contains an
MRI scan, CT Scan and x-ray exam room equipment.