University of South Florida
                                            South Pavilion at Tampa General, Tampa, FL
          Relevant Team Experience


































           SIZE                    SCHEDULE                 OWNER                    ARCHITECT
           126,082 Square Feet     15 months                USF Health               HKS Architects - Core / Shell
           Parking - Utilized New Valet
           Parking Garage at Tampa   COMPLETION DATE        REFERENCE                Alfonso Architects - Tenant
           General Hospital        2008                     Fell Stubbs              Improvement
                                                            813.974.3298
           CONSTRUCTION COST       CONTRACT TYPE                                     TEAM MEMBERS
           $23.6 Million           Construction Management                           Fred Hames
           Core/Shell/                                                               Matt Gilbert
           Tenant Improvement


                                                                       PROJECT DETAILS
          Th  is new seven-story, 126,000-SF medical offi  ce building (MOB) for       •   Th  e aspects of the project include an imaging
          the University of South Florida was constructed at the Tampa General   suite, exams rooms and staff  offi  ces
          Hospital (TGH) campus on an existing valet parking lot area.
                                                                          •   Th  e second, third, and fourth fl oors of the MOB
                                                                           are exam rooms, staff  work rooms and waiting
          Th  e MOB shell construction consisted of a structural steel frame with
                                                                           rooms
          metal stud, densglass and stucco exterior. Th  e lobby contains the elevator
          vestibule, restroom areas and mechanical and electrical spaces.  Th e balance      •  Th e fi fth, sixth and seventh fl oors consist of staff
          of the space on the fi rst fl oor is lease space to be completed during the   offi  ces for the new MOB.
          interior build-out phase of the project. Th  e construction of the interior
          spaces for this project consist of completing the common and corridor spaces
          on fl oors two through seven. At the lease spaces, the shell construction
          will provide the necessary utility stubs for future build-out.  Th e MOB
          tenant build-out construction consists of a multi-phased single tenant
          fi t-out for USF Health.  Th  e imaging suite on the fi rst fl oor contains an
          MRI scan, CT Scan and x-ray exam room equipment.