                                         MetWest International and MetWest II, Tampa, FL
          Relevant Team Experience


































          SIZE                     SCHEDULE                 OWNER                   ARCHITECT
          200,000-SF Offi  ce (2)  PHASE 1 - 2007 - 2009    Metropolitan Life Insurance  Thompson, Ventulett,
          75,000-SF Retail         PHASE 2 - 2011 - 2013    Company (MetLife)       Stainback & Associates
          1,700 Parking Spaces
                                   COMPLETION DATE          REFERENCE               TEAM MEMBERS
          CONSTRUCTION COST        Phase I: January 2009    Chuck Davis, 404.838.2830  Fred Hames
          Phase I: $65 Million     Phase II: January 2013   Bill MIller, 404.838.2817  Matt Gilbert
          Phase II: $46 Million                             Hank Brenner, 813.514.2433
                                   CONTRACT TYPE            Kent Walling, 813.514.2434
                                   Construction Management
                                   at Risk and Design-Build

                                                                       PROJECT DETAILS
         Th  is 31+ acre redevelopment in Tampa’s prestigious Westshore District      •   Achieved LEED Silver Certifi cation
         is being developed in multiple phases. Class A offi  ce spaces totaling
                                                                          •   1,462 space parking garage with a connecting
         787,500-SF, a 152,000-SF executive-level hotel, 75,000-SF in restaurant
                                                                           bridge
         and retail buildings in a village format and a 316,000-SF residential
         community with 4,200 additional parking spaces in the form of fl at
         parking and garages. Th  e project’s fi rst phase included the demolition of
         an existing 200,000-SF offi  ce building, site infrastructure; a 265,000-
         SF, ten-story Class A shell offi  ce building (achieved LEED® Gold
         Certifi cation); 7-building restaurant/retail village and two parking garages
         for over 1,700 cars. Th  e retail shops, boutiques, and restaurants provide
         amenity value to the redevelopment. Th  e MetWest Two Development
         is the project’s second phase including a new 265,000-SF, ten-story
         Class A shell offi  ce building. Th  e structure is steel with composite concrete
         decks. Th  e build out of the offi  ce space included meeting/training rooms
         and a hot/cold cafe.