Page 19 - portfolio
P. 19
CLIENT
D Mrs.&Mr. Kapur
DETAIL 1
340 2270 340 NOTES
1. This drawing is the property and copyright of THE
50 DESIGNER and shall not be copied or used in any
150
100 way without their written permission.
2. All dimensions are in mm and to be read only and
not measured.
150 150 675 3.Project managers/contractors to verify all site
conditions and any condition different or not in
525 correlation with the drawings/details must be
immediately informed to the architects.
H 4. The information in the dwg is to be taken in
50 QTY. CILL(MM) conjunction with the specification documents and
other documents that constitute the contract
documents in their entirety.
C G E A 5.It shall be deemed the responsibility of the
contractor or the fabricator to bring to the notice of
1500 the DESIGNER prior to any construction or
fabrication any discrepancy within or between the
a Polished stone aforementioned drawings. The designers have
b described their intentions and designs, to the best
of their ability and knowledge, in the contract
1050 2650 925 documents.
6. Contractor should submit the shop drawings/
F b sand blasted stone assembly detailed drawings for approval to the
architect and client representative.
7. Contractor should submit all the material samples
a for consultant's approval prior to start of material
procurement and start of work.
8. Contractor must erect a sample of partitions
75 c Wall 9" thk. ,wooden ceilings ,floorings,wall claddings ,fixtures
and fittings etc. prior to commencing remainder of
the work.
9. Contractor ,sub contractor and /or supplier remains
50 100 100 50 DETAIL 2 responsible for all aspects of safety and security of
2950 d Lintel 6" the product supplied by them as well as
drawings submitted for checking.
10. Architect will only be responsible for approving
design intent of shop drawings .No responsibility will
be taken by the architect for structural/ electrical/
plumbing HVAC or general safety of the final
B product.
11. PMC should co-ordinate with contractor/
vendors for timely submission of all above points.
REVISION
NO. DATE PARTICULARS
FRONT ELEVATION
1 27.08.19 GF room bigger, FF room changes
a c
62
62
a
c
ELEVATION H ELEVATION F
a
c
62
62
c
a
ELEVATION B ELEVATION D
6mm
62 62 6mm
d d
150 150
43 56
a a
JOINT DETAIL
50
75 75 325
c c
50
150
100
ELEVATION A ELEVATION G DRAWN BY: JIVITESH KAKKAR
CHECKED BY:
DATE: 20.11.19
525 W
62 62 S SW SE NW NE N
d E
d
PROJECT
150
a 150
a
50
RENOVATION OF
100 50 RESIDENCE AT
DLF-1
DETAIL 1
DRAWING TITLE
WINDOW MOULDING
DETAIL
75 75
c
c DRAWING NO. :
75 RK-AR- 024
ARCHITECTS & INTERIORS
ELEVATION C ELEVATION E 100 50
architects I interior designers
DETAIL 2 gurgaon