Page 19 - portfolio
P. 19

CLIENT
                                                     D                                                                                       Mrs.&Mr. Kapur


                                                                                         DETAIL 1
                          340                      2270                       340                                                            NOTES
                                                                                                                                             1. This drawing is the property and copyright of THE
                                50                                                                                                            DESIGNER and shall not be copied or used in any
                  150
                                100                                                                                                           way without their written permission.
                                                                                                                                             2. All dimensions are in mm and to be read only and
                                                                                                                                              not measured.
                        150                                                    150   675                                                     3.Project managers/contractors to verify all site
                                                                                                                                              conditions and any condition different or not in
                  525                                                                                                                         correlation with the drawings/details must be
                                                                                                                                              immediately informed to the architects.
                                                     H                                                                                       4. The information in the dwg is to be taken in
                                                                                          50                    QTY.      CILL(MM)            conjunction with the specification documents and
                                                                                                                                              other documents that constitute the contract
                                                                                                                                              documents in their entirety.
         C                        G                                 E                               A                                        5.It shall be deemed the responsibility of the
                                                                                                                                              contractor or the fabricator to bring to the notice of
                                   1500                                                                                                       the DESIGNER prior to any construction or
                                                                                                                                              fabrication any discrepancy within or between the
                                                                                                                 a     Polished stone         aforementioned drawings.  The designers have
                b                                                                                                                             described their intentions and designs, to the best
                                                                                                                                              of their ability and knowledge, in the contract
                  1050                             2650                              925                                                      documents.
                                                                                                                                             6. Contractor should submit the shop drawings/
                                                     F                                                           b   sand blasted stone       assembly detailed drawings for approval to the
                                                                                                                                              architect and client representative.
                                                                                                                                             7. Contractor should submit all the material samples
                a                                                                                                                             for consultant's approval prior to start of material
                                                                                                                                              procurement and start of work.
                                                                                                                                             8. Contractor must erect a sample of partitions
                                                                                      75                         c       Wall 9" thk.         ,wooden ceilings ,floorings,wall claddings ,fixtures
                                                                                                                                              and fittings etc. prior to commencing remainder of
                                                                                                                                              the work.
                                                                                                                                             9. Contractor ,sub contractor and /or supplier remains
                    50       100                                          100       50   DETAIL 2                                             responsible for all aspects of safety and security of
                                                   2950                                                          d         Lintel 6"          the product supplied by them as well as
                                                                                                                                              drawings submitted for checking.
                                                                                                                                             10.  Architect will only be responsible for approving
                                                                                                                                              design intent of shop drawings .No responsibility will
                                                                                                                                              be taken  by the architect for structural/ electrical/
                                                                                                                                              plumbing HVAC or general safety of the final
                                                     B                                                                                        product.
                                                                                                                                             11. PMC should co-ordinate with contractor/
                                                                                                                                              vendors for timely submission of all above points.
                                                                                                                                             REVISION
                                                                                                                                             NO.   DATE    PARTICULARS
                                              FRONT ELEVATION
                                                                                                                                             1  27.08.19  GF room bigger, FF room changes
            a                                                                    c
                                                               62
                                                                                                                                        62
                                                                                                                            a
         c
                              ELEVATION H                                                              ELEVATION F
                         a
                                                                                              c
                                                               62
                                                                                                                                       62
                     c
                                                                                                   a
                              ELEVATION B                                                             ELEVATION D



                                                                                                                            6mm

                        62                                   62                                                             6mm
                                d                                    d

                 150                                 150
                                                                                                       43                    56
                                a                                    a







                                                                                                                 JOINT DETAIL
                                                                                                         50
                 75                                   75                                                              325
                                c                                    c

                                                                                                      50
                                                                                                                                    150
                                                                                                      100
                 ELEVATION A                          ELEVATION G                                                                            DRAWN  BY: JIVITESH KAKKAR
                                                                                                                                             CHECKED BY:
                                                                                                                                             DATE: 20.11.19


                                                                                                                                    525                W
                    62                                 62                                                                                             S  SW  SE  NW NE  N
           d                                                                                                                                           E
                                              d
                                                                                                                                             PROJECT
                          150
           a                                                 150
                                              a
                                                                                                                                     50
                                                                                                                                                RENOVATION OF
                                                                                                                100             50                RESIDENCE AT
                                                                                                                                                      DLF-1
                                                                                                                     DETAIL 1
                                                                                                                                             DRAWING TITLE
                                                                                                                                              WINDOW MOULDING
                                                                                                                                              DETAIL
                           75                                 75
           c
                                              c                                                                                              DRAWING NO. :
                                                                                                                                    75       RK-AR- 024

                                                                                                                                             ARCHITECTS & INTERIORS
                  ELEVATION C                         ELEVATION E                                                   100      50

                                                                                                                                                  architects I interior designers
                                                                                                                      DETAIL 2                        gurgaon
   14   15   16   17   18   19   20   21   22   23   24