Page 21 - portfolio
P. 21
CLIENT
Mrs.&Mr. Kapur
D
NOTES
1. This drawing is the property and copyright of THE
DESIGNER and shall not be copied or used in any
way without their written permission.
16 gauze MS frame 2. All dimensions are in mm and to be read only and
180 220 210 210 220 180 not measured.
19mm x 19mm 3.Project managers/contractors to verify all site
conditions and any condition different or not in
correlation with the drawings/details must be
immediately informed to the architects.
4. The information in the dwg is to be taken in
conjunction with the specification documents and
other documents that constitute the contract
180 documents in their entirety.
5.It shall be deemed the responsibility of the
contractor or the fabricator to bring to the notice of
the DESIGNER prior to any construction or
fixing of MS frame 300 fabrication any discrepancy within or between the
aforementioned drawings. The designers have
to wall with screw described their intentions and designs, to the best
of their ability and knowledge, in the contract
documents.
6. Contractor should submit the shop drawings/
300 assembly detailed drawings for approval to the
architect and client representative.
7. Contractor should submit all the material samples
for consultant's approval prior to start of material
C A procurement and start of work.
8. Contractor must erect a sample of partitions
300 ,wooden ceilings ,floorings,wall claddings ,fixtures
and fittings etc. prior to commencing remainder of
the work.
9. Contractor ,sub contractor and /or supplier remains
responsible for all aspects of safety and security of
fixing of MS frame to the product supplied by them as well as
300 drawings submitted for checking.
wall with screw 10. Architect will only be responsible for approving
16 gauze MS frame design intent of shop drawings .No responsibility will
19mm x 19mm be taken by the architect for structural/ electrical/
plumbing HVAC or general safety of the final
product.
320 11. PMC should co-ordinate with contractor/
vendors for timely submission of all above points.
REVISION
70
NO. DATE PARTICULARS
1 27.08.19 GF room bigger, FF room changes
B
FRONT ELEVATION
100 100
Lintel 6" Lintel 6"
180 180
300 300
fixing of MS frame to fixing of MS frame to
wall with screw wall with screw
300 300
300 300
16 gauze MS frame 16 gauze MS frame
19mm x 19mm 19mm x 19mm
300 300
320 320
70 70
Wall 9" thk. Wall 9" thk.
ELEVATION C ELEVATION A
DRAWN BY: JIVITESH
180 210 220 210 220 180
CHECKED BY:
DATE: 20.11.19
fixing of MS frame to
wall with screw
16 gauze MS frame
19mm x 19mm
SW S W NW N
SE E NE
16 gauze MS frame
19mm x 19mm wall
PROJECT
19mm stone fixed
ELEVATION B
on M.S.sections with RENOVATION OF
chemical RESIDENCE AT
DLF-1
DRAWING TITLE
fixing of MS frame to
wall with screw WINDOW MOULDING
(M.S.FRAME) DETAIL
16 gauze MS frame
19mm x 19mm wall DRAWING NO. :
180 210 220 210 220 180
RK-AR- 024
ARCHITECTS & INTERIORS
ELEVATION D SAMPLE AS ON SITE
architects I interior designers
gurgaon