Page 21 - portfolio
P. 21

CLIENT
                                                                                                                                             Mrs.&Mr. Kapur

                                                                        D
                                                                                                                                             NOTES
                                                                                                                                             1. This drawing is the property and copyright of THE
                                                                                                                                              DESIGNER and shall not be copied or used in any
                                                                                                                                              way without their written permission.
                                                                                                 16 gauze MS frame                           2. All dimensions are in mm and to be read only and
                                                            180  220  210  210  220  180                                                      not measured.
                                                                                                 19mm x 19mm                                 3.Project managers/contractors to verify all site
                                                                                                                                              conditions and any condition different or not in
                                                                                                                                              correlation with the drawings/details must be
                                                                                                                                              immediately informed to the architects.
                                                                                                                                             4. The information in the dwg is to be taken in
                                                                                                                                              conjunction with the specification documents and
                                                                                                                                              other documents that constitute the contract
                                                                                                180                                           documents in their entirety.
                                                                                                                                             5.It shall be deemed the responsibility of the
                                                                                                                                              contractor or the fabricator to bring to the notice of
                                                                                                                                              the DESIGNER prior to any construction or
                                    fixing of MS frame                                          300                                           fabrication any discrepancy within or between the
                                                                                                                                              aforementioned drawings.  The designers have
                                    to wall with screw                                                                                        described their intentions and designs, to the best
                                                                                                                                              of their ability and knowledge, in the contract
                                                                                                                                              documents.
                                                                                                                                             6. Contractor should submit the shop drawings/
                                                                                                300                                           assembly detailed drawings for approval to the
                                                                                                                                              architect and client representative.
                                                                                                                                             7. Contractor should submit all the material samples
                                                                                                                                              for consultant's approval prior to start of material
                                         C                                                                   A                                procurement and start of work.
                                                                                                                                             8. Contractor must erect a sample of partitions
                                                                                                300                                           ,wooden ceilings ,floorings,wall claddings ,fixtures
                                                                                                                                              and fittings etc. prior to commencing remainder of
                                                                                                                                              the work.
                                                                                                                                             9. Contractor ,sub contractor and /or supplier remains
                                                                                                                                              responsible for all aspects of safety and security of
                                                                                                           fixing of MS frame to              the product supplied by them as well as
                                                                                                300                                           drawings submitted for checking.
                                                                                                           wall with screw                   10.  Architect will only be responsible for approving
                                   16 gauze MS frame                                                                                          design intent of shop drawings .No responsibility will
                                   19mm x 19mm                                                                                                be taken  by the architect for structural/ electrical/
                                                                                                                                              plumbing HVAC or general safety of the final
                                                                                                                                              product.
                                                                                                320                                          11. PMC should co-ordinate with contractor/
                                                                                                                                              vendors for timely submission of all above points.
                                                                                                                                             REVISION
                                                                                                70
                                                                                                                                             NO.   DATE    PARTICULARS
                                                                                                                                             1  27.08.19  GF room bigger, FF room changes
                                                                        B
                                                                 FRONT ELEVATION


                                               100                                               100
                           Lintel 6"                                                                             Lintel 6"


                                                       180                               180

                                                       300                               300

                 fixing of MS frame to                                                                            fixing of MS frame to
                 wall with screw                                                                                  wall with screw
                                                       300                               300


                                                       300                               300
                  16 gauze MS frame                                                                              16 gauze MS frame
                  19mm x 19mm                                                                                    19mm x 19mm
                                                       300                               300


                                                       320                               320

                                                       70                                70



                         Wall 9" thk.                                                                              Wall 9" thk.



                                      ELEVATION C                                              ELEVATION A




                                                                                                                                             DRAWN  BY: JIVITESH
                                180  210  220  210  220  180
                                                                                                                                             CHECKED BY:
                                                                                                                                             DATE: 20.11.19
         fixing of MS frame to
         wall with screw
                                                                                                                           16 gauze MS frame
                                                                                                                           19mm x 19mm
                                                                                                                                                      SW S  W  NW  N
                                                                                                                                                      SE  E  NE
         16 gauze MS frame
         19mm x 19mm                                                  wall
                                                                                                                                             PROJECT
                                                                                                                           19mm stone fixed
                                       ELEVATION B
                                                                                                                           on M.S.sections with  RENOVATION OF
                                                                                                                           chemical               RESIDENCE AT
                                                                                                                                                      DLF-1

                                                                                                                                             DRAWING TITLE
         fixing of MS frame to
         wall with screw                                                                                                                      WINDOW MOULDING
                                                                                                                                              (M.S.FRAME) DETAIL

         16 gauze MS frame
         19mm x 19mm                                                 wall                                                                    DRAWING NO. :
                               180  210  220  210  220   180
                                                                                                                                             RK-AR- 024
                                                                                                                                             ARCHITECTS & INTERIORS
                                      ELEVATION D                                            SAMPLE AS ON SITE

                                                                                                                                                  architects I interior designers
                                                                                                                                                      gurgaon
   16   17   18   19   20   21   22   23   24   25   26