Page 10 - Transformations Brochure
P. 10

Lick-Wilmerding High School
        San Francisco, CA






        Size: 60.000 sf

        Completion: 2018
        Market: K–12 Education



        As a major renovation and addition
        to the campus’ main classroom and
        administrative building, this project
        negotiates the physical constraints of
        a tight urban campus with the design
        constraints of a historic building that
        achieves net zero energy performance
        and a LEED  Platinum certification.
                   ®


        Lessons Learned

         1  The surrounding context may
           have changed since the original
           building was constructed. Look for
           opportunities to connect the new
           design with its surroundings.

         2  Look at the worst part of the existing
           building as a potential location for
           a major intervention. We replaced
           outdated toilets & locker rooms with a
           new entry to the school.


         3  Saving a historic curtain wall required
           deep collaboration with the design
           team, contractor, and city planner to
           add an interior acrylic glazing system
           to achieve “dual-pane” performance.