        San Francisco, CA






        Size: 60.000 sf

        Completion: 2018
        Market: K–12 Education



        As a major renovation and addition
        to the campus’ main classroom and
        administrative building, this project
        negotiates the physical constraints of
        a tight urban campus with the design
        constraints of a historic building that
        achieves net zero energy performance
        and a LEED  Platinum certification.
                   ®


        Lessons Learned

         1 The surrounding context may
           have changed since the original
           building was constructed. Look for
           opportunities to connect the new
           design with its surroundings.                                                                                                                                                                            Cumulative

         2 Look at the worst part of the existing                                                                                                                                                 2040    2045   2050  Emissions
                                                                                                                                                                                                                    (TCO2e)
           building as a potential location for                                                                                                                                           2035
           a major intervention. We replaced                                                                                                                                      2030
           outdated toilets & locker rooms with a                                                                           Pathway to Climate Positive                   2025
           new entry to the school.                                                                                                                                2020                                             5000

                                                                                                                            Reduction from Baseline
         3 Saving a historic curtain wall required
           deep collaboration with the design                                                                               Operational Emissions
           team, contractor, and city planner to                                                                            Embodied Emissions
           add an interior acrylic glazing system                                                                           Sequestration & Energy                                                                  0
           to achieve “dual-pane” performance.                                                                              Production