Page 94 - Buck Tilton "Outward Bound Ropes, Knots, and Hitches"
P. 94
Climbing Knots: Hitches
hang a load from a vertically suspended
rope, such as hanging a food bag while
camping, in which case the weight should
be attached to the loop or sling, not to the
carabiner, to prevent slipping.
H
Bachmann XXtch: Step 3 Bachmann Hi
XXtch: Step 4
i
XXX
Bring the end of the loop Bring the end of the loop
XXX
around the rope and through around the rope and through
the carabiner a second time. the carabiner a third time. If the
hitch does not grip adequately,
you may add another turn of
the loop. The knot must fin-
ish with the loop pulled out
through the carabiner.
79
OB_RopesKnots_RevFinal_CS4.indd 79 2/9/12 3:13 PM