       Removal of above ceiling services                                     Isolation certificate must be issued prior to removal for

                                                                              water, gas and electrical.
                                                                               An exclusion zone will be created to prevent others from walking
                                                                                underneath the units whilst they are being brought down.
                                                                                 Fan coil units to be removed from ceiling services will normally be

                                                                                  attached by hangers.
                                                                                   Prior to fan coil removal all the ducting and associated pipework will
                                                                                    need to be disconnected to free up the unit.
                                                                                     externally.






         The works will be planned with the site manager to methodically
         remove the sections back from the AHU’s following the ducting
         where possible.
         The site supervisor will carry out a dynamic risk assessment as the
         works progress to make sure the hazards of falling material and safe
         access is always controlled.  He will be competent enough to
         understand the risk of where items that are hung could potential

         swing if not properly controlled and cut correctly.

                                                          Make sure  the correct access equipment is used and checked







         E:  info@kph.co.uk    W:  www.kph.co.uk