Page 5 - FQ10571.RexConLLC.WI.-For-ReadyMixConcreteFacility.DC7000 wOption 2000 GalTank
P. 5

Page No. 2
                                                                                Proposal No. Q10571
                                                                                Date:  September 13, 2017

                         THIS PROPOSAL INCLUDES THE FOLLOWING PARTS AND SERVICE


               One (1)      Direct Contact Water Heater System Including the Following:

                            1.      UL Listed Burner Assembly.
                            2.      Inlet and outlet connection for water.
                            3.      Inlet water distribution nozzle assembly.
                            4.      Flanged stack connection. (20" diameter)
                            5.      Heat transfer medium.
                            6.      Dual walled water chamber.
                            7.      Type 304, stainless steel fabrication; other materials of construction are
                                    available if the supply water chemistry is of poor quality.
                            8.      One access manway on heater top and heater sidewall.

               One (1)      Stainless Steel Exhaust Stack:

                            1.      Ten (10) feet of stainless steel exhaust stack.  (20" diameter)


               One (1)      UL/FM Gas Firing and Control System Including:

                            1.      Heavy duty industrial burner.
                                    1.1    Stainless steel inner and outer blast tube, UV scanner tube and
                                           diffuser.
                                    1.2    Full modulation control system.

                            2.      Combustion air blower.

                                    2.1    Stainless steel blower wheel.
                                    2.2    5 Hp. motor.

                            3.      Combustion air pressure sensor switch.

                            4.      Prepiped and prewired UL/FM gas train including:

                                    4.1    Main gas shutoff valve.
                                    4.2    Main gas pressure regulator.
                                    4.3    Main gas valve, motorized with proof of closure.
                                    4.4    Modulating butterfly valve.
                                    4.5    High gas pressure switch.
                                    4.6    Low gas pressure switch.
                                    4.7    Main gas test valve.
   1   2   3   4   5   6   7   8   9   10