Page 3 - FQ08534-C.ImageFirst.NJ.DC4500 Gravity w1000GalTank
P. 3

Page No. 2
                                                                                Proposal No. Q08534-C
                                                                                Date:  April 20, 2017

                   THIS PROPOSAL INCLUDES THE FOLLOWING PARTS AND SERVICE:

               One (1)      Direct Contact Water Heater System Including the Following:

                              1.      UL Listed Burner Assembly.
                              2.      Inlet and outlet connection for water.
                              3.      Inlet water distribution nozzle assembly.
                              4.      Flanged stack connection.  (18" diameter)
                              5.        Heat transfer medium.
                            6.      Dual walled water chamber.
                            7.      Type 304, stainless steel fabrication; other materials of construction are
                                    available if the supply water chemistry is of poor quality.
                            8.      One access manway on heater top.
                            9.      Heater shell dimensions.  (107" Long x 57" Wide x 127" High)

               One (1)      Stainless Steel Exhaust Stack

                            1.      Ten (10) feet of stainless steel exhaust stack.  (18" diameter).

               One (1)      Modulating Gas Firing and Control System Including:

                            1.      Heavy duty industrial burner.

                                    1.1    Stainless steel inner and outer blast tube, UV scanner tube and
                                           diffuser.
                                    1.2    Full modulation control system.

                            2.      Combustion air blower.

                                    2.1    Stainless steel blower wheel.
                                    2.2    3 Hp. motor.

                            3.      Combustion air pressure sensor switch.

                            4.      Prepiped and prewired FM gas train including:

                                    4.1    Main gas shutoff valve.
                                    4.2    Main gas pressure regulator.
                                    4.3    Main gas valve, motorized with proof of closure.
                                    4.4    Modulating butterfly valve.
                                    4.5    High gas pressure switch.
                                    4.6    Low gas pressure switch.
                                    4.7    Main gas test valve.
   1   2   3   4   5   6   7   8