Page 7 - FQ08534-C.ImageFirst.NJ.DC4500 Gravity w1000GalTank
P. 7

Page No. 6
                                                                                Proposal No. Q08534-C
                                                                                Date:  April 20, 2017

               Note III - Customer to Provide

                            A.      Constant minimum gas pressure to the entrance of the gas train of:  1 PSIG
                                    @ 4,500 FT /HR.
                                              3

                            B.      Constant water pressure to the entrance of the water heater of:  30 PSIG
                                    minimum at 115 GPM.

                                    B.1    Ludell can furnish a booster pump with necessary controls at added
                                           cost, if required to obtain 30 PSIG minimum constant water
                                           pressure.

                            C.      Disconnect switches and wiring between remote valves and level controls.

                            D.      Electrical/Mechanical utility service to the heater.

                                    D.1    Power *460 Volts, 3 Phase, 60 Hertz to blower and pump.  *To be
                                           verified by customer.

                                    D.2    Control 115 Volts, 1 Phase, 60 Hertz to heater control panel.

                            E.      Piping from the heater overflow to a drain.

                            F.      Installation and hook-up of equipment prior to visit from Ludell Field
                                    Engineer.

                            G.      Local permits and approvals, if applicable.


               Note IV - Optional Offer

                            A.      Ludell offers dual gas trains for use with either propane or natural gas.  In
                                    addition, various types of gas trains are available, which meet GE GAP
                                    (formerly IRI), AGA, and CGA specifications.

                            B.      Spare parts kit.

                            C.      Extra stack sections.