Page 147 - RISK Management IC 86
P. 147
The Insurance Times
and products. The above information can be obtained from
Organisational Charts, Flow Charts and on spot
inspections. After assembling these details, all aspects of
compliance are to be checked.
All relevant documents are then studied carefully. Detailed
analysis of the perils that can affect the organization's
activities is then done in consultation with the management
and the staff and after on the spot inspections.
Prior study of the nature of operations ensures smooth
work. Sometimes, experts may need to be consulted for
technical hazards like electrical installations, characteristics
of materials in for fire and explosion.
The final stage of safety audit is the preparation of a
report providing :
(i) An analysis of the risks to which the organization is
exposed.
(ii) Recommendations for improving safety, listed in
order of priority
So, we see safety audit goes beyond risk identification to
include risk evaluation.
Website: www.bimabazaar.com Call: 033-22184184 / 40078428 148
Copyright@ The Insurance Times. 09883398055 / 09883380339