Page 147 - RISK Management IC 86
P. 147

The Insurance Times

          and products. The above information can be obtained from
          Organisational Charts, Flow Charts and on spot
          inspections. After assembling these details, all aspects of
          compliance are to be checked.

          All relevant documents are then studied carefully. Detailed
          analysis of the perils that can affect the organization's
          activities is then done in consultation with the management
          and the staff and after on the spot inspections.

          Prior study of the nature of operations ensures smooth
          work. Sometimes, experts may need to be consulted for
          technical hazards like electrical installations, characteristics
          of materials in for fire and explosion.

          The final stage of safety audit is the preparation of a
          report providing :
          (i) An analysis of the risks to which the organization is

               exposed.
          (ii) Recommendations for improving safety, listed in

               order of priority

          So, we see safety audit goes beyond risk identification to
          include risk evaluation.

Website: www.bimabazaar.com Call: 033-22184184 / 40078428  148

Copyright@ The Insurance Times. 09883398055 / 09883380339
   142   143   144   145   146   147   148   149   150   151   152