Page 980 - Divyank Tyagi
P. 980

946   |  PerformAnce oPtimizAtion  •  PlAcinG reviSion cloudS



                   performance optimization, 888, 889–892. See also   settings, 368–372
                    tips, tricks, troubleshooting                   tenant exercise, 402–416
                   permissions. See also worksharing                  Design Options tool, 413, 413–415, 414, 415
                      defined, 162                                    existing floor plan, 403
                      editing requests, 189–192                       Phase 1: Demolition, 404, 404–405, 405
                        Editing Request Placed dialog box, 190, 190   Phase 1: Proposed, 405–406, 406
                        Editing Requests dialog box, 191, 191         Phase 2: Demolition, 407, 407–408, 408
                        granting, 191–192                             Phase 2: Proposed, 408–409, 409
                        placing, 189–191                              scheduling, 410–413, 411, 412, 413
                      library worksharing analogy, 162–163         time element and, 363
                      relinquishing, 167–168, 168, 192             views, 366, 366, 376–382
                   persistence of tool location, 19                walls, 373, 373–376, 374, 375, 376
                   perspective views (camera views). See also    Phasing dialog box, 368–372
                    walkthroughs                                    diagram, 368
                      creating, 60, 60–62, 61                       Graphic Overrides tab, 368, 372, 372
                      generic model mass family, 314, 314           Phase Filters tab, 368, 370, 370–372, 371
                      orthographic views vs., 444                   Project Phases tab, 368–370, 369, 370
                      photorealistic visualizations              Photographic Exposure, Graphic Display Options
                        creating, 444, 444–447, 445, 446, 447     dialog box, 430, 430–431, 431
                        locking view settings, 447, 447–448      photorealistic visualizations, 443–470. See also
                      using, 59–60                                analytic visualizations; renderings; visualizations
                      view control bar, 418, 419                    analytic visualizations vs., 418, 443
                   Phase 1: Demolition, 404, 404–405, 405           Bottom Line, 471, 878–879
                   Phase 1: Proposed, 405–406, 406                  emotive, 417–418, 443, 471, 878
                   Phase 2: Demolition, 407, 407–408, 408           monochromatic views, 455–460, 456, 457,
                   Phase 2: Proposed, 408–409, 409                   458, 459
                   Phase Created, 103, 366, 376, 813, 877           perspective views
                   Phase Demolished, 103, 366, 373, 376, 813, 877     creating, 444, 444–447, 445, 446, 447
                   phase filters                                      lock view settings, 447, 447–448
                      Show All, 376, 377, 378, 403               Physical tab, Material Browser, 116, 118, 119
                      Show Complete, 371, 381, 382, 468          Pick New Host option, 73
                      Show Demo + New, 381, 381                  Pick Path, 310, 548, 605, 605–606
                      Show New, 371, 381, 381, 414               Pick Supports tool, 568
                      Show Previous, 379, 379                    Pick Walls method
                      Show Previous + Demo, 372, 379, 379, 404, 407  area plans on large projects, 728
                      Show Previous + New, 103, 379–380, 380, 405, 414  building pad, 99
                   Phase Filters tab, 368, 370, 370–372, 371        ceilings, 545–546, 554
                   Phase-Exist material, 374, 374–376, 375          Coordination Review, 224
                   Phases-Start.rvt, c10, 364, 373                  floors, 545–546
                   phasing, 363–382. See also design options; groups  roofs, 545–546, 557, 558
                      Bottom Line, 416, 877                         structural floor, 542, 542
                      communication’s importance, 416, 877          wall core, 481–482
                      construction sequencing, 363–364, 365, 416,    Pin tool, 84
                       809, 877                                  pinned panels and mullions, 513–514
                      defined, 363                               pinning coordinate systems, 208
                      4D simulation, 9, 10, 363                  pinning elements, 84
                      geometry, phasing properties, 373–376      Place At option, 234
                      introduction, 363–365                      placing masses, 280–281, 281
                      purpose, 877                               placing points, toposurface creation, 92–93, 93
                      rooms, 366, 366                            placing revision clouds, 800–802, 801











          bindex.indd   946                                                                          05-05-2014   16:28:40
   975   976   977   978   979   980   981   982   983   984   985