Page 980 - Divyank Tyagi
P. 980
946 | PerformAnce oPtimizAtion • PlAcinG reviSion cloudS
performance optimization, 888, 889–892. See also settings, 368–372
tips, tricks, troubleshooting tenant exercise, 402–416
permissions. See also worksharing Design Options tool, 413, 413–415, 414, 415
defined, 162 existing floor plan, 403
editing requests, 189–192 Phase 1: Demolition, 404, 404–405, 405
Editing Request Placed dialog box, 190, 190 Phase 1: Proposed, 405–406, 406
Editing Requests dialog box, 191, 191 Phase 2: Demolition, 407, 407–408, 408
granting, 191–192 Phase 2: Proposed, 408–409, 409
placing, 189–191 scheduling, 410–413, 411, 412, 413
library worksharing analogy, 162–163 time element and, 363
relinquishing, 167–168, 168, 192 views, 366, 366, 376–382
persistence of tool location, 19 walls, 373, 373–376, 374, 375, 376
perspective views (camera views). See also Phasing dialog box, 368–372
walkthroughs diagram, 368
creating, 60, 60–62, 61 Graphic Overrides tab, 368, 372, 372
generic model mass family, 314, 314 Phase Filters tab, 368, 370, 370–372, 371
orthographic views vs., 444 Project Phases tab, 368–370, 369, 370
photorealistic visualizations Photographic Exposure, Graphic Display Options
creating, 444, 444–447, 445, 446, 447 dialog box, 430, 430–431, 431
locking view settings, 447, 447–448 photorealistic visualizations, 443–470. See also
using, 59–60 analytic visualizations; renderings; visualizations
view control bar, 418, 419 analytic visualizations vs., 418, 443
Phase 1: Demolition, 404, 404–405, 405 Bottom Line, 471, 878–879
Phase 1: Proposed, 405–406, 406 emotive, 417–418, 443, 471, 878
Phase 2: Demolition, 407, 407–408, 408 monochromatic views, 455–460, 456, 457,
Phase 2: Proposed, 408–409, 409 458, 459
Phase Created, 103, 366, 376, 813, 877 perspective views
Phase Demolished, 103, 366, 373, 376, 813, 877 creating, 444, 444–447, 445, 446, 447
phase filters lock view settings, 447, 447–448
Show All, 376, 377, 378, 403 Physical tab, Material Browser, 116, 118, 119
Show Complete, 371, 381, 382, 468 Pick New Host option, 73
Show Demo + New, 381, 381 Pick Path, 310, 548, 605, 605–606
Show New, 371, 381, 381, 414 Pick Supports tool, 568
Show Previous, 379, 379 Pick Walls method
Show Previous + Demo, 372, 379, 379, 404, 407 area plans on large projects, 728
Show Previous + New, 103, 379–380, 380, 405, 414 building pad, 99
Phase Filters tab, 368, 370, 370–372, 371 ceilings, 545–546, 554
Phase-Exist material, 374, 374–376, 375 Coordination Review, 224
Phases-Start.rvt, c10, 364, 373 floors, 545–546
phasing, 363–382. See also design options; groups roofs, 545–546, 557, 558
Bottom Line, 416, 877 structural floor, 542, 542
communication’s importance, 416, 877 wall core, 481–482
construction sequencing, 363–364, 365, 416, Pin tool, 84
809, 877 pinned panels and mullions, 513–514
defined, 363 pinning coordinate systems, 208
4D simulation, 9, 10, 363 pinning elements, 84
geometry, phasing properties, 373–376 Place At option, 234
introduction, 363–365 placing masses, 280–281, 281
purpose, 877 placing points, toposurface creation, 92–93, 93
rooms, 366, 366 placing revision clouds, 800–802, 801
bindex.indd 946 05-05-2014 16:28:40

