Page 985 - Divyank Tyagi
P. 985

|
                                                                   rotAtinG elementS  •  ShAdinG, GrAPhicS tAB   951


                   rotating elements, 75–76                         Schedule/Quantities, 59, 282, 729, 737, 817,
                   .rte, 108, 912                                    885, 901
                   run, 627                                         Sheet List, 59, 729, 738, 738–739, 739, 916
                   RVT Link Display Settings dialog box, 215, 217   in templates, 738
                                                                    types, 729–730
                  S                                                 using, 58–59
                                                                    View List, 59, 729, 898–899, 899
                   safety, LiDAR, 849                               wall schedule, 735–736, 736
                   Sample-Building-Finish.rvt, c07, 249          scheduling
                   Sample-Building.rvt, c04, 136, 139               design options, 398–399
                   Sample-Building.rvt, c07, 251                    family categories, 578
                   Sample-Building_Start.rvt, c05, 163, 172,        keynotes, 764
                    173, 175                                        LiDAR scans, 854
                   Sample-Building-Start.rvt, c07, 240, 249, 257, 264  masses, 282–284, 324, 875–876
                   SAT files, 244–246, 258, 584                     parts, 817, 817, 818
                   Save As dialog box                               pattern-based curtain panel families,
                      central file, 165–167, 166                     536–537, 537
                      gbXML file, 362                               tenant exercise, 410–413, 411, 412, 413
                      shared parameters, 785                     Search bar, Material Browser, 123, 123
                   Save button, 179                              Section Box option, 62, 62, 98, 258, 432, 432–433,
                   Save command, 165, 166                         433, 864
                   Save Local File Before And After Synchronizing   section boxes
                    With Central, 181                               cut patterns, 125, 125
                   saving details. See details                      Mass Floors, 323, 323
                   saving work, 179–182. See also worksets          3D exports, 258–260
                   Scale tool, 80                                   3D views, 62, 62, 70
                   Schedule Properties dialog box                   toposurface, 91, 91
                      Appearance tab, 733, 733–734, 734             visualizations, 432, 432–433, 433
                      Calculated Value button, 283, 284, 411     section cuts, family categories, 576–577
                      cut/fill schedules, 103                    Section function, 54
                      Fields tab, 730–731, 731                   section tags, 146, 146–149, 147, 149
                      Filter tab, 731, 731–732                   sections, 54–56
                      Formatting tab, 732–733, 733               Select All Instances, 68, 156, 177, 891
                      Include Elements In Linked Files, 213, 730  Select Previous command, 66
                      room schedule, 730, 734                    Select Profile option, 311, 549, 611, 612
                      Sorting/Grouping tab, 732, 732             selecting elements, 65–70
                      wall schedule, 410–411, 735                   chain-select, 66
                   Schedule/Quantities, 59, 282, 729, 737, 817, 885, 901  filtering selections, 67–68, 69, 69
                   schedules. See also documentation; legends       selection colors, 66
                      area schedule, 736–737, 737                   selection options, 67, 67
                      Certification Objective, 728                  window-selection tool, 66, 176, 870
                      creating, 728–739                          selection-based filters, 68
                      defined, 58, 728                           sequence
                      Graphical Column Schedule, 59                 construction sequencing, 363–364, 365, 416,
                      key, 730                                       809, 877
                      Material Takeoffs, 59, 86, 117, 480, 550, 601, 729,   visualization sequence vs. design sequence,
                       884                                           443–444, 878–879
                      multi-category, 901–903, 902, 903          Set Work Plane tool, 526
                      Note Block, 59, 729                        Shade Depth, 344, 348
                      quality control, 901–903, 902, 903         Shaded view style, 422, 423
                      room schedule, 731, 731–735, 732, 733, 734  Shading, Graphics tab, 117, 118










          bindex.indd   951                                                                          05-05-2014   16:28:41
   980   981   982   983   984   985   986   987   988   989   990