Page 23 - Villas at Savona Close-out Manual
P. 23

IV. Relocation…. (Important, only as necessary. Not anticipated by JWC.)

                       Potential 5.0 Option for Geco Deck Coating for Private Decks…. (Low Priority)

                       Potential 5.0 Option for Removing and Reinstalling New Concrete and Drains for Private Decks….
               (Low Priority)

                       Potential 6.0 Option for Extensive Tile Roof Repair providing 10/20 Year Warranties on La-
               bor/Materials…. (To Be Considered pending results of further inspection)


                       Potential 7.0 Option for Extensive Low Sloped Roof Repair providing 10 Year Warranty…. (To Be
               Considered pending results of further inspection)

                       Upon initial decisions on the Preliminary Repair Summary, a call was placed to JWC to request a
               meeting for further discussion on Friday, June 26, 2015, at 10:00 AM at the Villas at Savona Clubhouse.
               Initial agreement was reached on the preferred date and time.
   18   19   20   21   22   23   24   25   26   27   28