                                                                                            Exhibit "A"
                                                                                                                                                                    AZ Rules of Evidence, Rule 408 and ARS 12-2238
                                                                                                                                                          JON WAYNE CONSTRUCTION AND CONSULTING
          The Villas at Savona                                                                                                                                                               6/15/2015
                                                                                        Preliminary Repair Summary
          Chandler, AZ  (84 Units consisting of 14 resident buildings & 1 pool building)                                           Prioritization Key:
                                                                              1. Immediate Danger                                                                  4. Detrimental to Long-Term Building Life
                                                                              2.  Water Intrusion / Life / Health / Safety: a. Water intrusion, b, Structural defects, c. Fire resistive Construction, d. mold, e. Other.  5. Other Defects
                                                                              3. Detrimental to Short-Term Building Life
                                                                        Final Scope of Work to be Determined
                                PER PLAINTIFF                                              PER JON WAYNE CONSTRUCTION AND CONSULTING                                     Board of Directors Priority
           Item #   Area / Description                                 Priority Repair Summary
                                                                                                                                                                      Very            To Be
          I. Geotechnical                                                                                                                                           Important  Important  Considered Low Priority

                                                                              Bldgs 2-15 plus Common Areas. Tight-line roof drains, install gutters and downspouts to 3-sides of
                                                                      2 a, b
                                                                              each building (tight lined). Add sump pumps to selected courtyards to assist with drainage.
                       Bldgs 2-15 plus Common Areas. Perform Repairs as
                        outlined in the TerraPacific Consulting plans and     Provide Civil Engineering to reevaluate project. Re-work grading to provide 5% slope for 5-10' from
           1.0-16.0  specifications including exterior cut-off walls and interior   2 a, b  building foundations.
                      slab replacements. Install Gutters and Downspouts. Re-  Provide Civil Engineering to reevaluate project.  Remove and replace selected worse case interior
                               grading. Replace pool concrete.                slabs. New slabs to not tie into existing footings, but install thickened edges and reinforcing steel.  Add
                                                                      2 a, b
                                                                              relief cuts to selected areas.  Repair cracks with epoxy. Budget allowance to repair interior drywall and
                                                                              misc. collateral damage

          II. Architectural
                                                                              Prep and Paint Buildings with Nationwide Ultra Satin Weatherproof Painting System (or equal). Grind
                    Exterior Walls and Foundations:  Replace all failing stucco,
             3.0                                                       2 a / 3 & caulk openings and transition details per specifications, patch all cracked stucco. Replace selected
                    demo and replace stucco at transition details.
                                                                              sections of failing stucco. 10-year Waterproof Warranty.
                    Windows and Exterior Doors: Remove stucco at window
                    surrounds.  Remove window, re-flash, and reinstall.       Windows: In conjunction with exterior weatherproof painting, inspect and repair reported leaking
             4.0                                                         2 a
                    Replace failing window products. Paint unpainted door     windows after painting. Doors: Seal unpainted door tops and bottoms as discovered.
                    surfaces.
                    Private Decks: Remove stucco at deck to wall transitions,   In conjunction with exterior weatherproof painting (see item #3.0), seal all deck surfaces with
                    remove concrete, install new waterproof system, Pour      Nationwide Crete Guard Concrete Sealer to mitigate water intrusion.  Caulk deck to wall transitions.
             5.0                                                         2 a
                    concrete and patch stucco.  Add new drains to selected    Provide budget allowance to Inspect and replace selected deck to wall flashing, Drains, and Scupper
                    decks.                                                    conditions (approx. 20% of decks).
                                                                              Perform proactive "Tune-up" to Tile Roofs.  Scope of work: Remove tile at all valleys and set aside for
                    Concrete Tile Roofs: Perform extensive roofing tune-up
             6.0                                                       2 a / 3 re-use.  Replace damaged felt, seal felt to valley metal using tree-course method, re-set existing tiles
                    repairs.
                                                                              and replace broken tiles to match existing as close as reasonably possible. Seal all penetrations.

                    Low Sloped Roofs: Remove and replace membrane             Perform Proactive inspection and Tune- up: Clean off debris, reseal all penetrations, splits, and old
             7.0                                                       2 a / 3
                    roofing.                                                  mastic.  Aluminum coat all repairs. 5 Year no leak warranty with annual inspection.