        1. Identify at least three (3) comparable projects for each team member, in which the team members served as
        CM@R, Agency CM, General Contractor or Subcontractor.  Comparable projects should be similar in scope,
        size and complexity. For each project please provide the following: a. description of project, b. role of the team
        members (include pre-construction services provided, if any) and experience on similar work, c. project’s original
        contracted construction cost and final construction cost, d. construction start and completion dates, e. owner, f.
        client references for each project, not associated with the City of Tucson. Please provide telephone numbers and
        email addresses.

                                     PROJECT DIRECTOR


                                  FRED KNAPP

















               town of marana police               northwest fire district               northwest fire district
             department headquarters             northwest fire station no.337        northwest fire station no.341
                    marana, az                           marana, az                            marana, az

          This project included the new construction of   This project consists of  a 8,900 SF new light   This  project  consists of  a  9,000  SF new  light
          a two-story, 42,327 sf public safety complex   duty fire station to serve the Dove Mountain   duty fire station to serve the Gladden Farms
          in Marana,  AZ. The new facility serves  as the   area of Marana, AZ. A portion of the building is   area of Marana,  AZ.  A portion of the building
          headquarters for the Marana Police Department   devoted to the aparatus bays and support areas.   is devoted to the  apparatus bays  and support
          and houses the Administration, Records, and K-9   The other portion of the building is designed as   areas. The other portion of the building is living
               Units with a detection cell block.  living space, offices, kitchen, and dorm rooms.  areas, offices, kitchen, and day room for staff.
                    size: 42,327 SF                       size: 8,900 SF                       size: 9,000 SF
                 Role: project director               Role: project director                Role: project director
          Services Provided: Estimating, scheduling,   Services Provided: Estimating, scheduling,   Services Provided: Estimating, scheduling,
            value engineering, quantity take-offs,   value engineering, quantity take-offs,   value engineering, quantity take-offs,
          constructability reviews, options studies,   constructability reviews, options studies,   constructability reviews, options studies,
                  virtual design (BIM)                 virtual design (BIM)                  virtual design (BIM)
                COST: $17,407,842 | $17,899,569      cost: $3,819,774 | $3,986,768         cost: $3,819,774 | $3,819,774
             start: 06/2017 | completion: 07/2018  start: 11/2018 | completion: 11/2019  start: 12/2018 | completion: 11/2019
                 owner: Town of Marana             owner: Northwest Fire District        owner: Northwest Fire District

                     References:                          References:                          References:
               Terry Rozema, Town of Marana      Heather Ruder, Northwest Fire District  Heather Ruder, Northwest Fire District
                    p: 520.382.2000                       p: 520.887.1010                      p: 520.887.1010
                e: trozema@maranaaz.gov             e: hruder@northwestfre.org           e: hruder@northwestfre.org
               Michael Rosso, Architekton          John Price, WSM Architects Inc.       John Price, WSM Architects Inc.
                    p: 480.894.4637                       p: 520.408.1044                      p: 520.408.1044
             e: michaelrosso@architekton.com          e: jprice@wsmarch.com                e: jprice@wsmarch.com