              SENIOR PROJECT MAN AGER


                                  RYAN KNAPP


















               town of marana police             Drexel Heights Fire District,       Raytheon B828 Firehouse Renovation
             department headquarters             New Administration Building                   tucson, az
                    marana, az                 and Fire Station no. 401 Remodel
                                                         tucson, az                  This project included the renovation of  a
          This project included the new construction of                              8,602  square  foot  Fire  Station. The  project
          a two-story, 42,327 sf public safety complex   The    Drexel Heights  Fire  District,  New   consisted of complete demolition and remodel
          in Marana,  AZ. The new facility serves  as the   Administration Building  and Fire Station   of  an existing fre station.   We had to setup  a
          headquarters for the Marana Police Department   401Remodel included construction of  a new   temporary fre station on the corner of the site,
          and houses the Administration, Records, and K-9   10,362 SF administration center and renovations   complete with  living  quarters, a weight  room
               Units with a detection cell block.  to  Fire  Station  No.  401.  Renovations  included  a   and  an operations center.  This station  was
                                               complete gut of current administration  center   the central physical hub of security for the
                    size: 42,327 SF            that is located in station 401, creation of new   Raytheon campus and had to be operational for
                 Role: project manager         living quarters  and renovation of the Fire   the duration of the project.
          Services Provided: Estimating, scheduling,   Stations apparatus bays.
            value engineering, quantity take-offs,                                             size: 8,602 SF
          constructability reviews, options studies,     size: 10,362 SF                    Role: project manager
                  virtual design (BIM)                Role: project director         Services Provided: Estimating, scheduling,
                COST: $17,407,842 | $17,899,569  Services Provided: Estimating, scheduling,   value engineering, quantity take-offs,
             start: 06/2017 | completion: 07/2018  value engineering, quantity take-offs,   constructability reviews, options studies,
                 owner: Town of Marana         constructability reviews, options studies,    virtual design (BIM)
                                                       virtual design (BIM)                cost: $2,721,969 | $2,803,621
                     References:                     cost: $3,058,643 | $2,926,424      start: 10/2010 | completion: 7/2011
               Terry Rozema, Town of Marana      start: 09/2019 | completion: 05/2020     owner: raytheon company
                    p: 520.382.2000               owner: Drexel Heights Fire District
                e: trozema@maranaaz.gov                                                        References:
                                                          References:                  Samuel Ramirez, Raytheon Company
               Michael Rosso, Architekton       Chief Doug Chappell, Drexel Heights Fire District  p: 520.794.7057
                    p: 480.894.4637                      p: 520.883.4341               e: samuel_a_ramirez@raytheon.com
             e: michaelrosso@architekton.com        e: dchappell@drexelfre.org
                                                                                         Ty Ransdell, Raytheon Company
                                                    John Price, WSM Architects Inc.            p: 520.794.4070
                                                         p: 520.408.1044                  e: transdell@raytheon.com
                                                      e: jprice@wsmarch.com