Page 24 - AZ - City of Tucson Fire Station 8 Rebuild
P. 24
SOQ No. 202496 CITY OF TUCSON Tab B
SENIOR PROJECT MAN AGER
RYAN KNAPP
town of marana police Drexel Heights Fire District, Raytheon B828 Firehouse Renovation
department headquarters New Administration Building tucson, az
marana, az and Fire Station no. 401 Remodel
tucson, az This project included the renovation of a
This project included the new construction of 8,602 square foot Fire Station. The project
a two-story, 42,327 sf public safety complex The Drexel Heights Fire District, New consisted of complete demolition and remodel
in Marana, AZ. The new facility serves as the Administration Building and Fire Station of an existing fre station. We had to setup a
headquarters for the Marana Police Department 401Remodel included construction of a new temporary fre station on the corner of the site,
and houses the Administration, Records, and K-9 10,362 SF administration center and renovations complete with living quarters, a weight room
Units with a detection cell block. to Fire Station No. 401. Renovations included a and an operations center. This station was
complete gut of current administration center the central physical hub of security for the
size: 42,327 SF that is located in station 401, creation of new Raytheon campus and had to be operational for
Role: project manager living quarters and renovation of the Fire the duration of the project.
Services Provided: Estimating, scheduling, Stations apparatus bays.
value engineering, quantity take-offs, size: 8,602 SF
constructability reviews, options studies, size: 10,362 SF Role: project manager
virtual design (BIM) Role: project director Services Provided: Estimating, scheduling,
COST: $17,407,842 | $17,899,569 Services Provided: Estimating, scheduling, value engineering, quantity take-offs,
start: 06/2017 | completion: 07/2018 value engineering, quantity take-offs, constructability reviews, options studies,
owner: Town of Marana constructability reviews, options studies, virtual design (BIM)
virtual design (BIM) cost: $2,721,969 | $2,803,621
References: cost: $3,058,643 | $2,926,424 start: 10/2010 | completion: 7/2011
Terry Rozema, Town of Marana start: 09/2019 | completion: 05/2020 owner: raytheon company
p: 520.382.2000 owner: Drexel Heights Fire District
e: trozema@maranaaz.gov References:
References: Samuel Ramirez, Raytheon Company
Michael Rosso, Architekton Chief Doug Chappell, Drexel Heights Fire District p: 520.794.7057
p: 480.894.4637 p: 520.883.4341 e: samuel_a_ramirez@raytheon.com
e: michaelrosso@architekton.com e: dchappell@drexelfre.org
Ty Ransdell, Raytheon Company
John Price, WSM Architects Inc. p: 520.794.4070
p: 520.408.1044 e: transdell@raytheon.com
e: jprice@wsmarch.com