Page 148 - Corkjoint E-Catalogue
P. 148

ADVANTAGES


             Fast and simple to install                               Improves site safety as lap bars are only

             Eliminates the need of hacking concrete to               exposed/bent out when required

             expose lap reinforcement bars                            Provides a rebate in the concrete to give

             Helps fast track concrete pouring schedules              added shear resistance

             providing savings in costs and time                      Produced to comply to the projects anchor
             Design and installation of formwork is simplified         and lap bar configurations and to bar


             No  wastage  at  site  as  the  system is  custom        diameter and spacing requirements

             designed to suit the exact length of area                Environmentally  friendly  as  eliminates  the
             Fully fabricated and assembled off-site in a             use of polystyrene block-outs that are used in
             factory controlled environment                           conventional site
             Cover & casing produced from pre-galvanised              fabricated systems
             steel providing a strong and rigid box                   Can be curved to suit radius requirements
                                                                      Available with a joint waterstop system if
                                                                      needed

              AREAS OF APPLICATION



      For use in many areas for construction joint connections:
             Slab to wall                    Slab to core walls
             Slab to slab                    Slab to diaphragm wall
             Slab to lift core walls         Pre-cast concrete elements for cast-in-situ connections
             Wall to wall                    Stair flights and landings
             Wall to column                  Corbels

       Note :  The products design and performance, its intended use, installation and final confirmation and approval for use,
               must be provided by the project’s Design Engineer and Project Manager.



















































               info@corkjoint.com   |   corkjoint.com                                                      Page 2
   143   144   145   146   147   148   149   150   151   152   153