Page 117 - Gefran - Inverter system and power supply unit (ADV200 Drive family)
P. 117

Gefran Spa - Drive & Motion Control Unit • www.gefran.com             117





          2. Multi-motor applications                         > Checking the precharge circuit
                                                              Precharge inductors LR3-…-PRC are needed to limit the cur-
                       3ph 690Vac - 50Hz  3ph 690Vac - 50Hz
                                                              rent for charging the condenser bank on the DC-link.
                                                              The standard inductors and the precharge circuit integrated in   ADV200 - 4
                       LR3-6-PRC              LR3-6-FFE-760   the FFE module are sized in order to charge a total capaci-
            Rectifire and Regen  Section  DC Precharge  FFE200-760-6+PRC-MS 20  tance on the DC Link that is greater than the one on a system
                                                  AC/DC Regen
                                                              where the total power of the ADV200 drives linked to the DC
                                                  FFE200-760-6-SL
                                                  FFE200-760-6-SL
                                                              Link corresponds to the maximum power deliverable by the
                   1995Adc + ovld 150% @ 930Vdc               FFE modules in parallel.
                                                              Therefore, these systems do not generally require a check of
                                                              correct precharge circuit size.                       ADV200-DC
            Inverter  Section  ADV200 500KW-6-DC  ADV200 355KW-6-DC  ADV200 500KW-6-DC  ADV200 355KW-6-DC




                500KW  M   355KW  M   500KW  M   355KW  M
                690Vac     690Vac     690Vac     690Vac                                                             ADV200 - 6
          The application consists of 4 asynchronous motors, each
          controlled by a separate inverter.
          The inverters are connected to a common DC-link.
          The DC-link is powered by an FFE regenerative system.
          The application requires 100% of motor and regenerating
          power of each asynchronous motor with 150% overload.                                                      ADV100

          Vmains = three-phase  690[V]
          Poutm1 = 500 [KW] @ Voutm1 = 690 [V]
          Poutm2 = 355 [KW] @ Voutm2 = 690 [V]
          Poutm3 = 500 [KW] @ Voutm3 = 690 [V]
          Poutm4 = 355 [KW] @ Voutm4 = 690 [V]
          ηm = 0.95                                                                                                 ADV80

          > Calculation of the current required on the DC-link:
          Vdc = Vmains [V] * 1.35 = 690 * 1.35 = 930 [V]

                                                     1000
          Pdc [W] = ( Poutm1[kW]+Poutm12[kW]+Poutm13[kW]+Poutm14[kW])*  =
                                                    (µm* µd)                                                        AFE200
                                   1000
          Pdc [W] = ( 500+355+500+355 ) *  = 1855670 [W]
                                 ( 0.95*0.97 )
                  Pdc [W]   1855670
          Idc [A] =      =          = 1995 [A]
                  Vdc [V]     930
          > Choosing the power supply unit and accessories:                                                         FFE200
          The chosen FFE200 power supply must be able to deliver cur-
          rent ≥ 1995[A] with 150% overload.
          Choose the size with the appropriate voltage and current
          characteristics from section "7.7 Output Data" on page 121 (see
          column DC output current @ 500…690VAC – Heavy Duty)
          x 3 FFE200-760-6                                                                                          SMB200

          This power supply consists of 3 modules in parallel. Only one
          of them (MS - master) is equipped with the precharge circuit
          for the total condenser bank on the DC-link.
          no. 1 FFE200-760-6+PRC-MS 20
          no. 1 FFE200-760-6-SL
          no. 1 FFE200-760-6-SL
          Choose the mains inductance (one for each FFE module) and                                                 PROGRAM.
          the precharge inductance from section "10.2.1. Input choke
          (L1 - CA)" on page 148:
          no. 3 LR3-6-FFE-760
          no. 1 LR3-6-PRC
                                                                                                                    APPENDIX