Page 21 - Brass, Composite and Thermoplastic Fittings and Valves
P. 21

TRANSPORTATION







            APPLICATIONS                                                                                               Introduction
            Air Brakes  |  Cab Controls  |  Fuel System  |  Engine  |  Transmission  |  Cooling  |  Air Tanks



                                                                                  PERFORMANCE EXPECTATIONS
                                                                                  • Compact design

                                                                                  • Impact resistant
                                                                                  • Meets DOT and SAE requirements
                                                                                  • Robustness
                                                                                  • Vibration resistance
                                                                                  • High reliability
                                                                                  • High temperature resistance

                                                                                  • Installation flexibility



            APPLICABLE PRODUCTS

            Prestomatic Fittings             Transmission Fittings
            PTC Fittings                     Vibra-Lok Fittings
            Prestomatic Cartridges           Truck Valves
            Manifolds                        Lanyard Valve
            NTA Fittings





                   ENGINEERING AN INNOVATIVE SOLUTION QUICKLY
                   SLA model confirms solution design and fit, saves time and expense




                   SITUATION: A major          The customer approved the
                   North American truck        functionality of the design, but
                   manufacturer initiated a    still needed to confirm fit in the
                   tubing routing change       confined application. In fewer
                   that required a fitting     than 10 days, the Parker team
                   not currently in stock.     provided a stereolithography
                   To meet the build schedule,   (SLA) model that confirmed the
                   the customer needed a       design’s fit. Satisfied with the
                   production-ready solution    results, the client authorized the
                   in six weeks.               go-ahead to create the final part,
                                               meeting his need for a produc-
                   SOLUTION: With the          tion-ready solution.
                   application requirements
                   understood, the Parker team   BENEFITS: Concept to
                   provided a 3D model within   production in less than
                   two days to confirm the tube   five weeks • Reduced
                   connection configurations.   prototype costs
   16   17   18   19   20   21   22   23   24   25   26