Page 84 - Linde - VT1 Modular, modular system for LSC manifold valve plates
P. 84

6 | Configuration of the valve system. Example configuration 2


            Example configuration 4x VW25-CF25, 2x VW30-CF25 (selection) on VT1EE with ABP, VT1ED
            with DMV2ABP, VT1ED with DMV3, VT1EP with DMV1 and VT1A



                Number of             VT1EE/                              Pressure
                                                               Tank
               Directional   Position  VT1EA/  Pilot control  check func-   relief     Return      Tie rod
               control valve          VT1EP/                   tion       module /     throttle
                functions             VT1ED                             blanking plate

               VW30-CF25
                 ``30ZY``    0.1.0    VT1EE       ABP                                 Without

               VW25-CF25     1.1.0                                                    Without
                 ``25M1``
                                      VT1ED    DMV2ABP/24
               VW25-CF25     1.1.1                                                    Without
                 ``25ZU``                                      KT3/         VT1A                    TR3
               VW25-CF25                                       KT5
                 ``25F1``    1.2.0                                                    Without
                                      VT1ED     DMV3/24
               VW25-CF25
                 ``25F2``    1.2.1                                                    Without
               VW30-CF25     1.3.0    VT1EP     DMV1/24                               Without
                 ``30W``


            Step 1
               The selected VW-CF25s (Chapter 4 ‘’Directional control valve
               variants.  Distinction”)  are  assigned  to  the  positions  and
               mounted on the assigned VT1EE, VT1ED and VT1EP with the
               associated cylinder bolts. The desired orientation (A side of
               the VW-CF25 to A or B side of the VT1EE) must be observed.
            Step 2
               The  selected  pilot  controls  (hydraulic  or  electro-hydraulic)
               are mounted on the VT1EE, VT1EP and the VT1ED (see chap-
               ter 5 “Assembly of VT1EE with pilot control”, “Assembly of
               VT1EA/VT1EP  with  pilot  control”  and  “Assembly  of  VT1ED
               with pilot control”).
               Combinations  VT1E/ABP,  VT1ED/DMV2ABP/24,  VT1ED/
               DMV3/24 and VT1EP/DMV1/24 are obtained.
               These are assigned to the positions.
            Step 3
               Bolt the selected system component VT1A with pre-assem-
               bled tie rod and cap nut onto the VT1EE (Chapter 5 “Assem-
               bly of system components. Preparation”).
            Step 4
               Bolt the selected components KT3 and KT5 onto the VT1EE in
               the desired direction of connection (see chapter 5 “Assem-
               bly of system components. VT1EE with KT3, KT5 tank check
               function”).




            >> O-rings and mounting bolts are an integral part of the
               respective system components.
            >> During assembly or installation, proper handling of the
               O-rings must be ensured.
            >> Observe interfaces IF32, CF25