Page 40 - DAEP PR REPORT - AUGUST 2025
P. 40

8/26/25, 2:48 PM                   Contract Awarded to Expand Bridge Access to Terminal 1 at Dubai International Airport


























        Project Details and Vision


        The total length of the expansion, inclusive of ramps, reaches 171 meters, with the main span extending approximately 70

        meters. This project is not limited to merely widening the thoroughfare; it encompasses a holistic improvement plan that
        includes upgrading road pavements, enhancing infrastructure services, and creating landscaping works that harmonize with the

        surrounding environment. New street lighting installations will further augment safety and visibility for all road users.

        One of the most significant outcomes anticipated from this expansion is the increase in the bridge’s capacity from 4,200

        vehicles per hour to 5,600 vehicles per hour, marking a remarkable 33 percent increase. Such a significant enhancement is not
        merely numerical; it strives to alleviate road congestion, improve safety, and substantially reduce travel times during peak
        hours.


        In light of these developments, Al Tayer reaffirmed the RTA’s unwavering dedication to advancing Dubai’s overall road and

        transport infrastructure. He stated, “Our objective remains to enhance the efficiency of key corridors and provide sustainable
        mobility solutions that foster the movement of both residents and visitors. This is integral to improving the quality of life in

        Dubai and reinforcing the emirate’s standing as a global hub for international events.”






























      https://dubaiforum.me/contract-awarded-to-expand-bridge-access-to-terminal-1-at-dubai-international-airport/  2/3
   35   36   37   38   39   40   41   42   43   44   45