Page 44 - DAEP PR REPORT - AUGUST 2025
P. 44

8/26/25, 2:48 PM                          RTA awards contract to widen bridge leading to Terminal 1 of DXB
        He further added that, “The bridge expansion is part of RTA’s continuous efforts to

        improve traffic flow and strengthen connectivity between major corridors and vital


        facilities, most notably Dubai International Airport, the world’s busiest airport for

        international passengers. The expansion will boost street capacity, improve

        safety, and shorten journey times during peak hours.”




        RTA Enhances Airport Street to Improve Terminal Access


        In recent years, RTA has implemented a project to upgrade Airport Street,

        covering the stretch from its intersection with Sheikh Mohammed bin Zayed Road

        to its intersection with Casablanca Street. The project included the construction of

        bridges and tunnels at Al Rashidiya, as well as at the intersections with


        Casablanca Street, Marrakech Street, and Nad Al Hamar Street, in addition to

        improvements to surface-level junctions.




        The project, which directly serves Dubai International Airport, also included the

        construction of a single-lane bridge providing direct access to Terminal 3 without

        stopping at the signalized intersection, another bridge leading to the Dubai

        Aviation Engineering Projects (DAEP) complex, and an additional single-lane


        bridge enabling traffic from Airport Street towards Casablanca Street without

        waiting at the signal. It further delivered an alternative route for vehicles from Al

        Garhoud to access Terminals 1 and 3 directly, along with the expansion of


        Casablanca Street from three to four lanes in the direction of Al Garhoud Bridge.






















      https://www.gccbusinessnews.com/rta-awards-contract-for-terminal-1/                                           3/3
   39   40   41   42   43   44   45   46   47   48   49