Page 17 - Safety
P. 17

on     PF-6.     At
                   about        10:30
                   hours       smoke
                   was  noticed  in
                   coach          No.
                   05410/C GS SC
              2    On  15.07.2019,  Cause:                        Primary
                   while moving Tr.  During           forward  T  Hanumanth,  Pay  reduced  by
                   No.         SNAG  move-ment           point  APM/SNF               one  stage  from
                   consisting of 32- No.3        got    trailed                       22800  to  22100
                   BCNL’s  &  BV  through  and  while                                 with     cumulative
                   from        Good  backing  over  the                               effect for a period
                   Shed-2           to  same            trailed                       of 18 months.
                   CWC/SNF,         4-  through  point,  the
                   BCN       wagons  wagons              have  Secondary:             Withholding  of  2
                   derailed      No’s  taken  two  routes  &  Ch.  Venkaiah,  sets of PTOs for the
                   CR30019960156,  derailed.                      LP/S/SNF            year.
                   SR/30069875134  Casualties:  Nil
                   WR/3008993459        Committee:
                   0  &  NR/92063  SSE/C&W/SNF,
                   on point No.3 at  TI/SNF.
                   08:30 hrs            SSE/P.Way/SNF         &
                                        CLI/SC
              3    On     25.01.2020  Cause:  At  such  a  Sri.K.  Manohar,  With  holding  of
                   at    07.30    hrs,  low     speed,      the  /Elect./M/HYB        increment  for  01
                   Diesel        loco  cable has infringed                            year (NC).
                   13395/MLY            between         wheel
                   during       shunt  flange & the LH rail,
                   movement from  resulting                  in  Sri  Alok  Kumar,  With  holding  of
                   Line-11  to  Rd-6  mounting         of    LH  SSE/P.Way/HYB-  increment  for  01
                   at  HYB  yard,  wheel                flange                        year (NC).
                   front  truck  two  causing
                   wheels  derailed  derailment.
                   on  line-11  near  Casualties:  Nil
                   pathway during  Cost  of  damages:
                   forward              Nil
                   movement.            Committee:
                                        DEE/Chg,
                                        DEN/Track,
                                        DOM/Gnl  &  DME/
                                        ELS/KZJ
   12   13   14   15   16   17   18