Page 16 - Safety
P. 16

capsized             Dy.CSO/Elec/HQ/SC
                   wagons         got
                   separated  with
                   a gap of about
                   176 meters.
              3    On 19.03.20          Cause:             The  None is held         Since it is due to

                   17.30hrs,derailm     Derailment         was  responsible.         material failure none
                   ent of rear MC       due  to  “defect  in  The CMT                is held responsible.
                   of 47141 MMTS        rolling   stock,    i.e.  report
                                        wheel  disc  broken  indicates that
                   (LPI-HYB) bet.       appears  to  have  root cause lies
                   LPI-HFZ at           occurred under the  in the
                   km.164/24            moving            train  metallurgy i.e
                                        caused              the  imperfect
                                        derailment”               grain structure
                                        Casualties:  Nil          which
                                        Cost  of  damages:  appears to
                                        Rs: 2,03,000              have
                                                                  developed at
                                        Committee:                the
                                        CPTM,       CRSE      &  manufacturin
                                        CE/TP                     g stage itself

               2. Yard accidents and Other incidents: 03
              Sl                        Cause,  Casualties,                           Status/Penalty
              No  Brief description  Cost of damages  &                               imposed
                   of accident          Committee                 Responsibility
              1    On     09.04.2019  Cause:        Miscreant  Primary:
                   train  No.  12759  activity                    Outsider  (other  ---
                   Charminar  Exp                                 than     Railway
                   arrived  HYB  at  Casualties:  Nil             staff)
                   08:15  hrs  on  PF-
                   6.  Fan  &  Lights  Cost of damages:    Secondary:
                   of      all    the    R/      ₹  14,54,50      None
                   coaches  were         Stoc              0/-
                   switched        off   k                        Blameworthy:     One  set  P  T  O
                   and  after  the                                P N Patnaik         withheld
                   entire               Committee:                SSE/C&W/HYB
                   passenger  de- Sr.DSO,              Sr.DSC,
                   boarded        the  Sr.DEE/M               &
                   train,  the  Doors  Sr.DME/Co-ord/SC
                   & Shunter of the
                   coaches  were
                   closed  by  09:00
                   hrs    and     the
                   empty         rake
                   remained  there
   11   12   13   14   15   16   17   18