Page 11 - Safety
P. 11

Media coverage at mock drill site on 08.04.2021

             c.  Bi  Monthly  safety  audit  conducted  by  PCSO/SC  and  other  HODs  at  RDM  &
                 BPA stations on 02/03.07.2021. DRM/SC conducted inspections at PRLI station,
                 yard, lobby & Running room on 16.07.21


























               PCSO inspection at Lobby/RDM on 02.07.21  At A cabin/RDM on 02.7.21






















               DRM inspection at PRLI station on 16.07.21       At Running room/PRLI

             d. SAFETY  SEMINAR  ON  SPAD  PREVENTION:  A  safety  seminar  conducted  at  Hawa
               Mahal/Sanchalan  Bhavan  on  28.08.2021  from  09.45  to  13.30  hrs  on  SPAD
               prevention and action plan. PCEE/SC, DRM, CEE Plg & Op, ADRM/O, Sr DSO & Sr
               DEE/TRSO participated  and had interaction with recent SPAD involved crew and
               counselled running staff to adhere to the signal aspect.
                 About 80 running staff of SC & HYB Division including CLIs attended the seminar.
                 PCEE & DRM interacted with recent SPAD involved crew and knew the cause of
                  the SPAD.
                 Power point presentation given on SPAD analysis and causes of the spad.
                 All  running  staff  counseled  to  adhere  to  the  signal  aspect,  especially  while
                  passing signal at CAUTION aspect  and regulate speed accordingly  to ensure
                  stop before stop signal.
   6   7   8   9   10   11   12   13   14   15   16