Page 11 - Safety
P. 11
Media coverage at mock drill site on 08.04.2021
c. Bi Monthly safety audit conducted by PCSO/SC and other HODs at RDM &
BPA stations on 02/03.07.2021. DRM/SC conducted inspections at PRLI station,
yard, lobby & Running room on 16.07.21
PCSO inspection at Lobby/RDM on 02.07.21 At A cabin/RDM on 02.7.21
DRM inspection at PRLI station on 16.07.21 At Running room/PRLI
d. SAFETY SEMINAR ON SPAD PREVENTION: A safety seminar conducted at Hawa
Mahal/Sanchalan Bhavan on 28.08.2021 from 09.45 to 13.30 hrs on SPAD
prevention and action plan. PCEE/SC, DRM, CEE Plg & Op, ADRM/O, Sr DSO & Sr
DEE/TRSO participated and had interaction with recent SPAD involved crew and
counselled running staff to adhere to the signal aspect.
About 80 running staff of SC & HYB Division including CLIs attended the seminar.
PCEE & DRM interacted with recent SPAD involved crew and knew the cause of
the SPAD.
Power point presentation given on SPAD analysis and causes of the spad.
All running staff counseled to adhere to the signal aspect, especially while
passing signal at CAUTION aspect and regulate speed accordingly to ensure
stop before stop signal.