Page 6 - Safety
P. 6

  Competency  of  Gatemen  and  availability  of  infrastructure  as  per
                     prescribed norms, are being ensured.
                   Night  Surprise  Checks  are  being  conducted  to  ensure  alertness  and
                     sobriety of Gatemen.
                   Gatemen  are  being  counselled  on  action  to  be  taken  in  case  of
                     unusual/abnormalities noticed by running trains.
                   Safety  boards  are  provided  at  all  LCs  indicating  duties  of  Gatemen  on
                     observation of various abnormal situations.
                   Gatemen  are  being  counselled  on  action  to  be  taken  in  case  of  gate
                     failures/road vehicles obstructing –Dealing of trains.
                   Joint  ambush  checks  with  civil  authorities  are  conducted  to  nab  errant
                     road vehicle drivers under the provisions of the Motor Vehicles Act, 1988,
                     and the Railways Act, 1989.
               D.  Steps taken for system improvements and to  bring awareness

                    among safety category staff:
                    Safety  drives  are  being  conducted  as  given  in  safety  calendar  and  as
                     and  when  ordered  by  RB/HQ/Division.  Total  24  safety  drives  conducted
                     upto  Oct’21(RB-10,  HQ-9  &  Divn-5).  Its  compliance  is  submitted  to  CSO
                     office and no drive’s compliance is pending as on date.
                     Frequent  ambush  checks/night  inspections  are  being  conducted  and

                     staff alertness being checked. Errant staff are being brought to the notice
                     of concerned branch officers.
                    Intensive  inspection/audits  conducted  at  major  private  sidings  and  the
                     deficiencies  noticed  were  advised  to  siding  authorities  for  immediate
                     attention.
                    The  deficiencies/irregularities  noticed  during  safety  inspections  by  safety
                     branch  are  being  uploaded  in  SIMS  inspection  module  and  its
                     compliance  are  being  monitored  by  safety  branch  and  resolving  the

                     issues in SIMS.
                    New initiative taken- Daily one G&SR rule is being messaged to all safety
                     category staff CUG phone numbers.
                    Audio Visual aid for smart counseling to Yard staff and Pvt/FCI sidings staff
                     on stabling in Pvt siding, shunting in siding and wrapping of tarpaulin on
                     wagons is arranged.
                    Monitoring  the  counselling  of  TM  operators  at  specified  intervals  to
                     update their knowledge by CLIs at every crew depot, where these staff
                     are working and as directed by SSE/TM/in charge.

                    HAND  BOOK  ON  SIGNAL  LOCATIONS  OF  ALL  SECTIONS  WORKED  BY  SC
                     DIVISION CREW INCLUDING ADJACENT DIVISIONS WITH SPECIAL EMPHASIS
                     ON RHS LOCATIONS ISSUED TO ALL CREW.
                    Safety improvement by collaborative efforts at SKP ballast siding – Siding
                     1&2  track  linking  at  exit  point  was  suspended  due  to  combination  fish
                     plates  for  90R  &  52kg  rails.  On  insisting  and  arranging  required  material
   1   2   3   4   5   6   7   8   9   10   11