Page 10 - Safety
P. 10
Two coaches toppled with the help of 140T ADRM/O/SC, Sr DSO/SC witnessed the
Crane to create scene mock exercise
SPMRV/KZJ staff made arrangements to NDRF team cutting the windows to rescue
cut the window. the passengers
Satellite link was established by NDRF. Removal of main door of a coach was less
time consuming and removed in 13 minutes.