Page 13 - Electrical (M)
P. 13

2.3  Replacement of defective Micro Processors:
                        19  nos.  of  Micro  Processors
                        (U/W-10      &     O/W-9)       were
                        defective  in  LHB  EOG  AC
                        coaches  at  SC.  Replaced  all
                        defective      equipments        and
                        ensured      working      in   good
                        condition.








                  2.4  HOG Test-Kit for testing IV/UIC coupler continuity test:
                        Department staff had designed & developed a portable test-kit which will
                        be used to check the healthiness of HOG control circuit of LOCO, Power

                        car, LSLRD and testing of IV/UIC coupler.





















                                     Front view of test-kit                    Back view of test-kit


                  2.4  Replacement of defective Micro Processors
                           Initially  2.5KW  EBC  and  4.5KW
                            RBC  were  used  to  provide  110V
                            DC feed to control circuits of AC
                            panel  &  both  were  mounted
                            inside  Switch  Board  Cabinet
                            onboard.
                           2017      onward        both      were
                            replaced  by  EBC  and  mounted
                            inside Switch Board Cabinet.
                           In  case  of  any  failure  like  MCB
                            tripping,  it  was  attended  in
                            running          condition           by
                            accompany mechanic.
                           2019 onward  RBC &  EBC  has  been  replaced  by  combined RBC  cum
                            EBC (4.5 KW) and mounted underframe.