Page 13 - Electrical (M)
P. 13
2.3 Replacement of defective Micro Processors:
19 nos. of Micro Processors
(U/W-10 & O/W-9) were
defective in LHB EOG AC
coaches at SC. Replaced all
defective equipments and
ensured working in good
condition.
2.4 HOG Test-Kit for testing IV/UIC coupler continuity test:
Department staff had designed & developed a portable test-kit which will
be used to check the healthiness of HOG control circuit of LOCO, Power
car, LSLRD and testing of IV/UIC coupler.
Front view of test-kit Back view of test-kit
2.4 Replacement of defective Micro Processors
Initially 2.5KW EBC and 4.5KW
RBC were used to provide 110V
DC feed to control circuits of AC
panel & both were mounted
inside Switch Board Cabinet
onboard.
2017 onward both were
replaced by EBC and mounted
inside Switch Board Cabinet.
In case of any failure like MCB
tripping, it was attended in
running condition by
accompany mechanic.
2019 onward RBC & EBC has been replaced by combined RBC cum
EBC (4.5 KW) and mounted underframe.