Page 23 - Signal & Tele
P. 23
c. At Nekkonda (NKD) – Intekanne (INK) IB worn out /aged signaling gears
have been replaced duly providing Deltron make UFSBI interface (Ver. 3.0)
to improve reliability on 29.06.2021by Projects Organization.
d. Replacement of Obsolete Indoor gears at Potkapalli (PTKP) station with
Kyosan Electronic Interlocking, Hot standby, Dual VDU with Distributed EI duly
providing AC for relay rooms, NI panel & Fire alarm on 24.04.2021 by Projects
Organization.
3. Yard Re-modeling/ new BP -Cabin :
Moturari Yard re-modeling done and signaling arrangements in connection
with By-Pass line towards Jagayyapet town Branch line at Kazipet end for
direct dispatch /reception of trains from MTMI-BP cabin with Medha Make
Electronic interlocking with Dual VDU, Hot standby, Distributed EI, No. of Routes-
24, NI panel, ELD, Fire alarm by Construction Organization on 05.09.2021.
4. Interlocking of LC gates: (2 -LC gates)
a. LC02 (E) (VKB-SSPD) at Km No. 1/11-12, Class – B2 has been interlocked and
commissioned with EOLB, Push button type Mini Panel, ESLB, Invertor and RTU
on 13.05.2021.