Page 23 - Signal & Tele
P. 23

c. At  Nekkonda  (NKD)  –  Intekanne  (INK)  IB  worn  out  /aged  signaling  gears
                   have been replaced duly providing Deltron make UFSBI interface (Ver. 3.0)
                   to improve reliability on 29.06.2021by Projects Organization.

















                 d. Replacement  of  Obsolete  Indoor  gears  at  Potkapalli  (PTKP)  station  with
                   Kyosan Electronic Interlocking, Hot standby, Dual VDU with Distributed EI duly
                   providing AC for relay rooms, NI panel & Fire alarm on 24.04.2021 by Projects
                   Organization.
            3.  Yard Re-modeling/ new BP -Cabin :
                 Moturari  Yard  re-modeling  done  and  signaling  arrangements  in  connection
                 with  By-Pass  line  towards  Jagayyapet  town  Branch  line  at  Kazipet  end  for
                 direct  dispatch  /reception  of  trains  from  MTMI-BP  cabin  with  Medha  Make
                 Electronic interlocking with Dual VDU, Hot standby, Distributed EI, No. of Routes-
                 24, NI panel, ELD, Fire alarm by Construction Organization on 05.09.2021.












            4.  Interlocking of LC gates: (2 -LC gates)
                 a. LC02 (E) (VKB-SSPD) at Km No. 1/11-12, Class – B2 has been interlocked and
                   commissioned with EOLB, Push button type Mini Panel, ESLB, Invertor and RTU
                   on 13.05.2021.
   18   19   20   21   22   23   24   25   26   27