Page 13 - Traction Distribution
P. 13

  Electrification of 685 mts of new line at GDK siding:


                 As  per  the  request  from  siding  authorities  for  685  mts  of  new  line  with
                 electrification for easing the loading activities at GDK siding, the works related
                 to TRD are completed.










                                                 Fig: GDK siding LOP


                Provision of DJ STOP boards  for 16 car MEMU @DKJ and SEM:

                   New 16 car MEMU services in place of 12 car MEMU are introduced between
                 BDCR-SRUR and SC-WD from 19/20.07.2021. New DJ Close boards are provided
                 at WD and KRA SSPs with suitable length for 16 car MEMU to avoid the bridging
                 of supply.










                                                   Fig: DJ Closed bords for 16 car MEMU.
                Replacement of NICCO make contact wire:

                 NICCO make contact wire is a failure prone contact wire and replacement of
                 the  same  is  the  foremost  work  to  do  for  TRD  in  the  Division  to  avert  the
                 breakdowns. Division has taken up the work and replacing in full pace from last
                 two  years.  There  are  Total  197  TLs  identified  for  replacement.  so  far  37  TLs
                 (47387 Mts) of contact wire replaced.













                                    Fig: Replacement of NICCO contact wire