Page 3 - Traction Distribution
P. 3
Line Diagram of division indicating Electrified & Non-Electrified Sections
Fig. Line Diagram of TRD SC Division
Staff details of TRD SC Division
Total Electrified
Name of the
Division Sanctio Actual RKM TKM
ns
SC 762 622 1190 2955
* RB letter No: E(MPP)2019/1/12, dated : 30/09/2019.
CHECK OF EARTHING OF VARIOUS STRUCTURES:
Earthling of OHE structures, platform shelters, Foot Over Bridges and Girder
bridges are being checked regularly and corrective action being taken
immediately.
CHECKING OF IMPLANTATIONS:
Implantations of all the structures are being checked periodically.
a) Performance Statistics:
Action plan items for the year 2021-22:
Prog Balance
Sl. Targe
No. Item in brief t ress
Elimination of Cross track feeder for the first track by
connecting jumper directly from gantry/ mast using
1 standard out-rigger arrangement (it will reduce two 25 5 20
cross feeders if connected to the nearest track OHE)
(RB Lt.No.2013/Elec(G) / 1,48 / 1, dated 10.5.2019).