10 42 KV LAs 438 293 293 100%
11 25KVÄ Interrupters 1384 705 705 100%
12 SPI 173 103 103 100%
25KVÄ Isolators
13 BPI 358 255 255 100%
05
KVA 228 131 131 100%
10
KVA 828 531 531 100%
25KV/230VÄ 25
14 60 57 57 100%
AOH of ATs KVA
50 10 6 6 100%
KVA
100
KVA 14 16 16 100%
15 ग Gantry 91 58 58 100%
सीर ज रए टर
16 60 28 28 100%
Series Reactor
शंट कपै सटर ब क
े
17 120 41 41 100%
Shunt Capacitor Banks
b) Energy Consumption vs Energy Charges:
APTRANSCO Con & Charges TSTRANSCO Con & Charges
30.00 400.00 365.12
24.53 350.00
25.00 21.80 281.86
18.70 300.00
20.00 250.00 230.85
15.00 200.00
10.00 150.00
4.50 100.00 66.36
5.00 3.61 2.72 48.17 39.75
50.00
0.00 0.00
2019-20 2020-21 2021-22( Till OCT) 2019-20 2020-21 2021-22( Till OCT)
Andhra Pradesh TRANSCO Telangana TRANSCO
Open Access Status:
Electrical Traction Distribution has initiated the process for the Open Access
from power supply utilities through REMCL to get power at a cheaper rate. For this,
Availability Based Tariff meters installation and SCADA (Supervisory Communication
and Data Acquisition) system has been processed with TRANSCO. Total Rs. 16.86
crores has been paid to TRANSCOs for providing ABT meters and 1.3 crores has
been paid for Data Acquisition System.