Page 5 - Traction Distribution
P. 5

Digitalization of LOPs & OHE
             10                                                  0         0
                   drawings
                   Attention to critical implantation
             11                                                  0         0
                   locations as per Spl. Drive No. 33
                   Replacement of 150 mm pulley
             12    ATD's with 250mm modified                     0         0
                   grooved 3- pulley
                   Provision of long creepage
                   composite insulators at sections
             13                                                  0         3
                   near to sea coast and at polluted
                   zones.
                   Replacement of Failure prone                                  Tendering under
             14                                                 40        47
                   Contact wire (NICCO make )                                    progress
                   Replacement of failure prone
             15                                                 37        19
                   catenary wire in crossovers
                   Earth mat renewal in TSS's and                                Work under progress
             16                                                  0         0
                   renewal of earth electrodes                                   at GNP/TSS
                   Replacement of all bonds and
             17    earth electrodes in Switching                 0         0
                   stations
                   Provision of Nylon mesh in portal
             18                                                  0        37
                   booms to prevent nesting by birds
                   Replacement of rubber hose pipes
             19                                                  0         0
                   in Tower Car with braided pipes
                   Elimination of IOL's/ SI's before
             20                                                  0         0
                   STOP signals
                   Enhancement of Transformer
             21    capacity by adding the cooling                0         0
                   fans
             22    Provision of RAILNET in all depots           12         0
                   Replacement of aged porcelain
             23                                                  0       408
                   insulators

           Status of Maintenance of OHE  Assets:


                                                            Cumulative  Done  िकए  गए  शे ूलों  का

                                           वािषक      ल
               ं
            .स.                                             Target          up  to  संचयी   ितशत  Cum.
           S.No.   िववरण                   Yearly           upto            OCT      %  of  schedules
                   Description             Target           Oct 21          21       done.

           1       टनआउट Turnouts               1124             656         745            114%
                    ासओवर
           2                                     338             197         271            137%
                   Crossovers
                     े
                                      े
                                     ु
                   स न          इनसलटर
           3                                     989             577         710            123%
                   Section Insulators
           4       पीटीएफई PTFE                  79               46         133            289%
                   एटीडी    का    एओएच
           5                                    4305            2511        2964            118%
                   AOH OF ATDs
                   एटीडी  का  पीओएच
           6                                     630             368         354             96%
                   POH of ATDs