Page 5 - Traction Distribution
P. 5
Digitalization of LOPs & OHE
10 0 0
drawings
Attention to critical implantation
11 0 0
locations as per Spl. Drive No. 33
Replacement of 150 mm pulley
12 ATD's with 250mm modified 0 0
grooved 3- pulley
Provision of long creepage
composite insulators at sections
13 0 3
near to sea coast and at polluted
zones.
Replacement of Failure prone Tendering under
14 40 47
Contact wire (NICCO make ) progress
Replacement of failure prone
15 37 19
catenary wire in crossovers
Earth mat renewal in TSS's and Work under progress
16 0 0
renewal of earth electrodes at GNP/TSS
Replacement of all bonds and
17 earth electrodes in Switching 0 0
stations
Provision of Nylon mesh in portal
18 0 37
booms to prevent nesting by birds
Replacement of rubber hose pipes
19 0 0
in Tower Car with braided pipes
Elimination of IOL's/ SI's before
20 0 0
STOP signals
Enhancement of Transformer
21 capacity by adding the cooling 0 0
fans
22 Provision of RAILNET in all depots 12 0
Replacement of aged porcelain
23 0 408
insulators
Status of Maintenance of OHE Assets:
Cumulative Done िकए गए शे ूलों का
वािषक ल
ं
.स. Target up to संचयी ितशत Cum.
S.No. िववरण Yearly upto OCT % of schedules
Description Target Oct 21 21 done.
1 टनआउट Turnouts 1124 656 745 114%
ासओवर
2 338 197 271 137%
Crossovers
े
े
ु
स न इनसलटर
3 989 577 710 123%
Section Insulators
4 पीटीएफई PTFE 79 46 133 289%
एटीडी का एओएच
5 4305 2511 2964 118%
AOH OF ATDs
एटीडी का पीओएच
6 630 368 354 96%
POH of ATDs