Page 53 - ENGINEERING
P. 53

3.1.31. Improvement of Marugutti Tunnel :


                       It is a D-shaped tunnel of diameter 4.92 m at the face and height of
                       6.70 m at crown level (from RL). The length of the tunnel is 1.645 km, out
                       of which 200 m length Gulbarga end and 25 m towards BIDR end with
                       cut and cover method. The tunnel has been lined for the length of 1200
                       m  and  balance  400m  is  unlined  portion.  The  maximum  over  burden
                       available  is  25m.  The  tunnel  approaches  towards  Gulbarga  end  are

                       made with five benches and normal cutting of 9-10m at BIDR end. The
                       catch  water  drain  has  been  provided  at  the  bottom  bench  for
                       Gulbarga end.

                      REASON  FOR  THE  COLLAPSE  OF  THE  FACE  WALL  GULBARGA  END  AND
                      FALLING OF BOULDERS FROM CUTTING BIDR END

                         (i)     Gulbarga  end:  while  making  the  cut  and  cover  portion  the
                                 cutting  made  is  much  lower  than  normal  hillock.  The  catch
                                 water  provided  with  CC  walls  only  upto  the  centre  of  the

                                 tunnel balance portion up to disposable point was not done,
                                 this resulted in stagnation of water in the entire 200 m length
                                 and suddenly gushed the face wall which is build with normal
                                 stone  masonry  wall  and  entire  masonry  of  10m  length  along
                                 with boulders, filled material laying over cut and cover portion
                                 came on to the track.

                         (ii)    BIDR  end:  The  catch  water  drains  provided  are  become
                                 defunct  the  rain  water  entered  into  the  cutting  and  the
                                 weathered rock and some portion of the slopes which are with
                                 normal  earth  fallen  on  to  the  track.  The  retaining  wall
                                 constructed was sunk for a length of 10 m.
                      PERMANENT MEASURES TAKEN
                       Gulbarga end:

                   (i)   Provided pucca catch water drain with RCC for a length of 120 mts.
                          The  existing  soil  heap  is  removed  and  widened  on  both  sides  of
                          LHS&RHS to prevent  the slippage of earth into drain due to heavy
                          rain
                   (ii)   Jacketing  of  face  and  parapet  wall  with  RCC  in  integrating  with
                          tunnel at Gulbarga end.


                                          Before