3.1.28. WATER TANK AT MABD:
New water tank has been constructed at MABD, WL, SKZR, KDM & GRP
MABD SKZR
3.1.29. PROVISION OF NEW PLATFORM AND COP AT ZAHIRABAD:
New platform No.2 was constructed, COP of 3 spans and two new
shelters provided on platform No.2. On P.F No.1, on both sides of
station, polished Shahabad flooring surface provided in place of the
damaged cement concrete flooring.
ZB: newly constructed pf2 ZB: newly constructed cop on PF2
3.1.30. HIGH LEVEL PLATFORM:
High Level Platforms have been provided in 6 nos of stations ie PNF,
JOA, GTU, KMNR, BTPD, LPI against the annual target of 26 no of
stations during the year in the division.
KAMALNAGAR: RL PF CONVERTED TO HLPF