Page 47 - ENGINEERING
P. 47

3.1.16.  FLOORING WORK:
                       shabad stone flooring work has been completed in PPY station.














               3.1.17.  PROVISION OF NEW PLATFORM AND COP AT ZAHIRABAD:

                    New  platform  No.2  was  constructed,  COP  of  3  spans  and  two  new
                    shelters provided on platform No.2. On P.F No.1, on both sides of station,
                    polished Shahabad flooring surface provided in place of  the damaged
                    cement concrete flooring.












                        zahirabad: newly constructed pf2          zahirabad: newly constructed cop on pf2