Page 54 - ENGINEERING
P. 54

(iii)    Gulbarga  end:  The  cutting  on  LH  side  which  is  with  5  benches  in
                          which  2nd &  3rd  benches  are  Doweld and  Shotcreted  to  prevent
                          slippage of boulders/slopes and also provided Catch water  drains
                          on all five benches.The earth bund is provided to on the top bench
                          to prevent for incoming of rain water gushed into bench and also in
                          track.












                       BIDR End:


                   (i)   The LH and RH side cutting is widened by 20m upto a length of 60 m
                          duly providing 3 benches
                   (ii)   Provided  shotcreting  and  rockbolting  at  both  LH  and  RH    sides  to
                          prevent slippage of boulders.

                   (iii)   Provided retaining wall for a length of 20m in RH side and 40 m in LH
                          side.
                   (iv)  For  safety  of  track  the  existing  soil  heap  was  too  vertical  and  very
                          close to the existing deep cut portion of RHS side which is removed
                          and widened on top bench of RHS to prevent slippage of earth into
                          track due to heavy rain in monsoon season.
   49   50   51   52   53   54   55   56