Page 56 - ENGINEERING
P. 56

MRF                                   NCHS


               5. ASSISTANCE REQUIRED:

                     There are a large number of vacancies in P.Way cadre. The position of
                       SSE/P.way, after restructuring, is shown below. It is requested  to fill up
                       the vacancies to make up the huge short fall.


                          Category                Sanction             Actual          Vacancy

                           SSE/P.Way                 138                 95                43

                            JE/P.Way                 111                 73                38
   51   52   53   54   55   56