Silo
GENERAL INSPECTION
Design vs works executed
INCLUDES:
▪ Verification that the silo was erected according to the qualities and original
design.
▪ To be done at least once during the life of silo if a correct silo construction is
in doubt.
GOOD PRACTICE
▪ To be done preferably with empty and clean silo and including internal
inspection
▪ Inspector to check for evidences of deficient erection (bad quality of
work/material or discrepancies vs original design).
REMARKS
▪ Modifications from the original design and retrofitting must pass the
engineering review and validation process.
IMAGES:
NOTES: