Page 110 - GM E-BOOKLET 2022
P. 110
4.8 STAIR CASE CONNECTION FROM NEW FOB TO OLD ESCALATOR AT
SECUNDERABAD RAILWAY STATION
For new FOB,a escalator was required.Requirement of this new escalator
fulfilled by connecting the new FOB with near old escalator of demonlished
FOB by staircases.This saved the cost of new escalator.
Staircase @ Platform 2&3 Staircase @ Platform 6&7
Staircase @ Platform: 1 Staircase @ Platform: 4 & 5
5. ASSISTANCE REQUIRED:
There are a large number of vacancies in P.Way cadre. The position of
SSE/P.way, after restructuring, is shown below. It is requested to fill up the
vacancies to make up the huge short fall.
Category Sanction Actual Vacancy
SSE/P.Way 138 104 (-)34
JE/P.Way 111 51 (-)60
Track maintainers 5493 4567 (-)926
108