4.8 STAIR   CASE   CONNECTION       FROM    NEW   FOB   TO  OLD   ESCALATOR     AT
               SECUNDERABAD RAILWAY STATION
               For new  FOB,a  escalator was required.Requirement  of  this  new escalator

               fulfilled by connecting the new FOB with near old escalator of demonlished
               FOB by staircases.This saved the cost of new escalator.























                         Staircase @ Platform 2&3                      Staircase @ Platform 6&7























                          Staircase @ Platform: 1                    Staircase @ Platform: 4 & 5



               5. ASSISTANCE REQUIRED:

                   There  are  a  large  number  of  vacancies  in  P.Way  cadre.  The  position  of
                   SSE/P.way, after restructuring, is shown below. It is requested to fill up the
                   vacancies to make up the huge short fall.

                        Category                Sanction             Actual          Vacancy


                       SSE/P.Way                    138                104              (-)34

                        JE/P.Way                    111                51               (-)60


                   Track maintainers               5493               4567             (-)926