DETAILS OF VIP/MP/MLA REFERENES PERTAINING TO Sr. DEN/North/SC’s JURISDICTION
S. Name of VIP/MP Station Date of Matter referred Remarks Sent on
No. Received
1 Shri. Bandi Sanjay KRMR NIL 3. ROB at Karimnagar Town at LC 3. Remarks: 07.11.20
Kumar Hon’ble MP No.18(T). A work for construction of ROB at LC No.18 (T) 22
(LS) Karimnagar at km 35/5-6 in KRMR yard on PDPL-NZB
section has been sanctioned in 2021 and
transferred to Construction Organisation.
Current status: GAD is under preparation.
Subsequent to sanction of GAD, the detailed
estimate will be prepared.
4. Elimination of the LC No.26: LC 4. Remarks:
No.26 between KPHI – GDRA The requested location is at Level Crossing
(called as Ramadugu Gate) should No.26 at km.48/2-3 between PDPL-NZB section
be eliminated suitably with with Train Vehicle Units 26,837 as on May 2021.
RUB/ROB to avoid the traffic As per terrain and field survey at the location of
congestion. Kindly sanction the Level Crossing NO.26 the construction of Road
same Under Bridge is not feasible and construction of
383
Road Under Bridge may generate permanent
drainage issues. Provision of Road Over Bridge
V. Passenger Amenities will be examined if State Government comes
forward on full deposit terms.
1. Upgradation and Provision of
New FOB along with V. 1 Remarks:
Lifts/Escalators at KRMR Station. At present, Karimnagar Station has only one
Platform, where all the passenger trains are
dealt. Hence, there is no requirement of FOB,
Lift or escalator at present.
2. Watering facility available – To
start from KRMR station. 2. Remarks:
At Karimnagar station, Coach watering
facilities are available. Full watering of all
nominated terminating/originating/pass
through trains is being ensured.
3. MFC complex sanctioned at 3. Remarks: