DETAILS OF VIP/MP/MLA REFERENES PERTAINING TO Sr. DEN/North/SC’s JURISDICTION


               S.     Name of VIP/MP         Station     Date of              Matter referred                                Remarks                       Sent on
              No.                                       Received
               1     Shri. Bandi Sanjay      KRMR          NIL      3. ROB at Karimnagar Town at LC  3. Remarks:                                           07.11.20
                     Kumar Hon’ble MP                               No.18(T).                            A work for construction of ROB at LC No.18 (T)  22
                     (LS)  Karimnagar                                                                    at  km  35/5-6  in  KRMR  yard  on  PDPL-NZB
                                                                                                         section  has  been  sanctioned  in  2021  and
                                                                                                         transferred to Construction Organisation.
                                                                                                         Current  status:  GAD  is  under  preparation.
                                                                                                         Subsequent  to     sanction  of  GAD,  the detailed
                                                                                                         estimate will be prepared.

                                                                    4. Elimination of the LC No.26: LC   4. Remarks:
                                                                    No.26  between  KPHI  –  GDRA        The  requested  location  is  at  Level  Crossing
                                                                    (called as Ramadugu Gate) should     No.26 at km.48/2-3 between PDPL-NZB section
                                                                    be   eliminated    suitably    with   with Train Vehicle Units 26,837 as on May 2021.
                                                                    RUB/ROB  to  avoid  the  traffic     As per terrain and field survey at the location of
                                                                    congestion.  Kindly  sanction  the   Level Crossing NO.26 the construction of Road
                                                                    same                                 Under Bridge is not feasible and construction of
      383
                                                                                                         Road  Under  Bridge  may  generate  permanent
                                                                                                         drainage issues. Provision of Road Over Bridge
                                                                    V. Passenger Amenities               will  be  examined  if  State  Government  comes

                                                                                                         forward on full deposit terms.
                                                                    1.  Upgradation  and  Provision  of
                                                                    New       FOB       along      with   V. 1 Remarks:
                                                                    Lifts/Escalators at KRMR Station.    At  present,  Karimnagar  Station  has  only  one
                                                                                                         Platform,  where  all  the  passenger  trains  are
                                                                                                         dealt.  Hence,  there  is  no  requirement  of  FOB,
                                                                                                         Lift or escalator at present.
                                                                    2.  Watering  facility available  –  To
                                                                    start from KRMR station.             2. Remarks:
                                                                                                          At  Karimnagar  station,  Coach  watering
                                                                                                         facilities  are  available.  Full  watering  of  all
                                                                                                         nominated         terminating/originating/pass
                                                                                                         through trains is being ensured.

                                                                    3.  MFC  complex  sanctioned  at  3. Remarks: