8. FOB at Karimnagar Railway         are  already  provided  at  this  Station.  All
                                                                    Station                              passenger  trains  stopping  at  this  station  are
                                                                                                         dealt on Platform No.1 as Platform No.2 is Rail
                                                                                                         level  Platform. Hence,  there  is  no  requirement
                                                                                                         of FOB, Lift or escalator at present. The existing
                                                                                                         facilities  are  sufficient  on  the  level  of  traffic
                                                                                                         dealt at the station at present and provision of
                                                                                                         Foot  Over  Bridge  will  be  considered  when
                                                                                                         required.




                                                              1.
               2     Shri. Bandi Sanjay      KRMR        12.10.202  Developing  KRMR  Railway  station       1.  Karimnagar  is  NSG-5 category  station.  20.10.20
                     Kumar Hon’ble MP                        2      under Major Up-gradation Scheme.             This  station  was  developed  under  22
                     (LS)  Karimnagar                                                                            Adarsh Station Scheme in the year 2013-
                                                                                                                 14. This station was part of Peddapalli –
                                                                                                                 Karimnagar  New  line,  commissioned
                                                                                                                 in  the  year  2002.    All  Amenities  as  per
      385
                                                                                                                 norms are provided.

                                                                                                             2.  A  work  for  “Provision    of  Two
                                                                                                                 additional  loop  lines,  shunting  neck
                                                                                                                 with  CSR    and  relocation  of  station
                                                                                                                 building    “   is   sanctioned       in
                                                                                                                 September’2022 for Rs. 25.70  Crs .

                                                                                                                 In  addition to existing  4 lines  (1 main
                                                                                                                 line,    1  loop  line  and  2  Goods  lines)
                                                                                                                 Estimate for  2 loop lines  (1loop line and
                                                                                                                 1  goods  line)  and  1  shunting  neck  is
                                                                                                                 under  preparation  and    Drawings    are
                                                                                                                 under  Approval.

                                                                                                                 In  addition  to  Station  building  ,
                                                                                                                 Construction  of  Signal  &  Telecom
                                                                                                                 building   is   under    process      to