Page 389 - GM E-BOOKLET 2022
P. 389
Total: Rs. 79.06
Crores.
Date of NA Work sanctioned in
Sanction the month of
Feb’2020.
Date of NA As per the letter
Survey from Public Works
Circle, Chandrapur
of Maharashtra
Government No.
1140/Ka.2(4)
OB/RUB/2022, dtd:
Date of NA 21-02-2022, where
DPR in it is stated that
the appointment
of agency for
survey work and
Maps NA preparation of
attache GAD, alignment
387
d if any plan is in progress
and the
documents
required will be
submitted at an
earliest.
4 Sri. Durgam Mancheria 30.06.202 Construction of ROB at Rechini The Site where demand for ROB is inspected 15.09.20
3.
Chinnaiah Hon’ble l 2 Road between gate No.65,66 to 67 and it is to inform that the construction of ROB 22.
MLA in Bellampally Constituency-reg is feasible at km 229/10-12 which falls between
LC No.66 and LC No.67. The Work can be taken
up, if State Government comes forward on ful
deposit terms.
5 Shri Soyam Babu NIL 4. Railway Over Bridge at Gate No.29. Road Over Bridge I lieu of Level Crossing 02.03.20
Rao, Hon’ble Should be approved on priority basis No.29 and Road Under Bridge in lieu of Level 22
MP/Adilabad as it is also very much required for crossing No.30 have been sanctioned at a cost of
the people passing through in that Rs. 76.70 Cr. On cost sharing basis.
area and heavy rush and it is General Arrangement Drawings for the above
convenient for construction 159/2- work have been approved. Railway portion