Page 390 - GM E-BOOKLET 2022
P. 390

160/0.                                 estimate is kept ready since April 2019. Detailed
                                                              5.                                          Estimate for approaches from State Government
                                                              6.   Railway     Under     Bridge     was  are awaited. CE/R&B is being pursued.
                                                                   proposed at gate No.30
                                                              7.   Is  sanctioned  and  the  process  for
                                                                   tendering also called but it has put in
                                                                   pending, but it is too late to take up
                                                                   this  issues.  It  should  bbe  speed  up
                                                                   and all the sanctions must be done in
                                                                   this financial year only 161/1-2.
               6     Shri. Balubhau Alias     Wirur      25.05.202  Request  for  sanction  of  RUB  near      There is no Level crossing gate exists     10.06.20
                     Suresh    Dhanorkar     Railway         2      Pole                             No.159/17  and   at km.159/17 and 159/18.             22
                     Hon’ble                             station      159/18  at Wirur Railway station          The location falls in Wirur yard
                     MP of  Chandrapur                                                                           towards BPQ end which is having 5
                                                                                                                 running   lines.
                                                                                                               There is a village road available at up
                                                                                                                 line side of the proposed location
                                                                                                                 and at DN line side, no road is
                                                                                                                 available.
      388
                                                                                                               Drainage arrangement is feasible
                                                                                                                 towards BPQ end where major water
                                                                                                                 way bridge no.269 is existing at
                                                                                                                 km.158/30-36  and drain is  available
                                                                                                                 to  a length of  600 mtrs.
                                                                                                           If   State  Govt.  comes  forward  on  full
                                                                                                          deposit  terms,  Joint  inspection  will  be
                                                                                                          conducted  for  provision  of  Road  under
                                                                                                          Bridge.

               7.    Shri.  B.  Venkatesh     Rajiv     04.01.202 Request for permission to use           The  above  said  location  of  Br  No.150  is  03.06.2
                     Netha Hon’ble MP        nagar,         2        Railway  use  Railway  Under  situated at Km. 259/8-10 in between MMZ- 022
                     (LS)                      Mancheri             Culvert No.150 situated at Rajiv  MCL  on  DN  Km.259/9-11  on  up  line  in
                     Peddapally             al Town                 nagar,  Mancherial  Town  to  between  MCI-MMZ  is  a  minor  water  way
                     Constituency                                   facilitate transportation of public  bridge  of  spans  3X3.66  RCC  Slabs.  And
                     Telangana                                                                            moreover this bridge is located in change of
   385   386   387   388   389   390   391   392   393   394   395