Page 390 - GM E-BOOKLET 2022
P. 390
160/0. estimate is kept ready since April 2019. Detailed
5. Estimate for approaches from State Government
6. Railway Under Bridge was are awaited. CE/R&B is being pursued.
proposed at gate No.30
7. Is sanctioned and the process for
tendering also called but it has put in
pending, but it is too late to take up
this issues. It should bbe speed up
and all the sanctions must be done in
this financial year only 161/1-2.
6 Shri. Balubhau Alias Wirur 25.05.202 Request for sanction of RUB near There is no Level crossing gate exists 10.06.20
Suresh Dhanorkar Railway 2 Pole No.159/17 and at km.159/17 and 159/18. 22
Hon’ble station 159/18 at Wirur Railway station The location falls in Wirur yard
MP of Chandrapur towards BPQ end which is having 5
running lines.
There is a village road available at up
line side of the proposed location
and at DN line side, no road is
available.
388
Drainage arrangement is feasible
towards BPQ end where major water
way bridge no.269 is existing at
km.158/30-36 and drain is available
to a length of 600 mtrs.
If State Govt. comes forward on full
deposit terms, Joint inspection will be
conducted for provision of Road under
Bridge.
7. Shri. B. Venkatesh Rajiv 04.01.202 Request for permission to use The above said location of Br No.150 is 03.06.2
Netha Hon’ble MP nagar, 2 Railway use Railway Under situated at Km. 259/8-10 in between MMZ- 022
(LS) Mancheri Culvert No.150 situated at Rajiv MCL on DN Km.259/9-11 on up line in
Peddapally al Town nagar, Mancherial Town to between MCI-MMZ is a minor water way
Constituency facilitate transportation of public bridge of spans 3X3.66 RCC Slabs. And
Telangana moreover this bridge is located in change of