Page 392 - @Annual Report_PLN Batam__2019_Lowress_Neat
P. 392
Rencana Kerja Strategis Tahun 2019 Strategic Plan 2019
Direksi telah menyusun Rencana Kerja sebagai sasaran Board of Directors has prepared a Work Plan as the
atau fokus Perusahaan tahun 2019. Hal itu dilakukan Company’s target or focus in 2019. This is done in the
dalam rangka pengembangan Perusahaan, menjamin event of Company’s development, to ensure electricity
ketersediaan listrik di area operasi bright PLN Batam availability in bright PLN Batam operational area and
dan memenuhi target KPI yang telah disusun, yang fulfill designated KPI target, comprising of:
terdiri dari :
Kap/
Proyek Lokasi Satuan Jumlah Unit Total Keterangan Progres
No
Project Location Unit Number Cap/ Total Description Progress
Unit
I Pembangkit | Generator
1 Studi FS & Kijang – MW 2 65 130 Mulai Proses studi oleh PUSENLIS. Namun sampai
Pengadaan Lahan Bintan Pengadaan akhir tahun 2019 belum ada penugasan
PLTU di Pulau Bintan Juni 2019
FS & Land Acquisition Study process by PUSENLIS. However, until the
Study for PLTU in Starting end of 2019 there was no assignment
Bintan Island Procurement
June 2019
2 Program LTSA MPP Tersebar MW 20 25 500 19 Januari Program LTSA MPP yang telah dilaksanakan
LTSA MPP program 8 Lokasi 2019 Tahun 2019 :
Spread 1. Pekerjaan Borescope Inspection (BSI) di
over 8 January 19, TM#1 dan TM#4 PLTG MPP 4 x 25 MW Tarahan
locations 2019 – Lampung
2. Pekerjaan Borescope Inspection (BSI)
di TM#1 dan TM#3 PLTG MPP 3 x 25 MW
Balaipungut – Duri
3. Pekerjaan Borescope Inspection (BSI) di
TM#1 PLTG MPP 2 x 25 MW Air Anyir – Bangka
4. Pekerjaan Borescope Inspection (BSI) di
TM#1 PLTG MPP 25 MW Gunung Sitoli – Nias
5. Pekerjaan Borescope Inspection (BSI) di
TM#1 dan TM#3 PLTG MPP 3 x 25 MW Paya
Pasir – Medan
6. Pekerjaan Borescope Inspection (BSI) di
TM#1 PLTG MPP 2 x 25 Jeranjang - Lombok
The LTSA MPP program that has been
implemented in 2019:
1. Borescope Inspection (BSI) work at TM # 1 and
TM # 4 PLTG MPP 4 x 25 MW Tarahan - Lampung
2. Borescope Inspection (BSI) work at TM # 1 and
TM # 3 PLTG MPP 3 x 25 MW Balaipungut - Duri
3. Borescope Inspection (BSI) work at TM # 1
PLTG MPP 2 x 25 MW Air Anyir - Bangka
4. Borescope Inspection (BSI) work at TM # 1
PLTG MPP 25 MW Gunung Sitoli - Nias
5. Borescope Inspection (BSI) work at TM # 1 and
TM # 3 PLTG MPP 3 x 25 MW Paya Pasir - Medan
6. Borescope Inspection (BSI) work at TM # 1
PLTG MPP 2 x 25 Jeranjang - Lombok
3 Pengadaan Tg Balai MW 2 5 10 Agustus Telah dilakukan penandatanganan MOU
Pembangkit berbasis Karimun 2019 kerjasama pembangkitan berbasis LNG 10
LNG di sekitar August 2019 MW di Tanjung Balai Karimun pada tanggal 26
kepulauan Riau Agustus 2019
Procurement of LNG- An MOU was signed on a 10 MW LNG-based
based power plants generation cooperation in Tanjung Balai Karimun
around the Riau on August 26, 2019
Islands
4 Operation & Tersebar MW 2 50 100 2019 Proses negosiasi harga dengan PLN UIW Babel
Maintenance Spread
Pembangkitan Price negotiation process with PLN UIW Babel
Generation Operation
& Maintenance
Laporan Tahunan | 2019 | Annual Report 391 PT Pelayanan Listrik Nasional Batam