Rencana Kerja Strategis Tahun 2019              Strategic Plan 2019

            Direksi telah menyusun Rencana Kerja sebagai sasaran   Board of Directors has prepared a Work Plan as the
            atau fokus Perusahaan tahun 2019. Hal itu dilakukan   Company’s target or focus in 2019. This is done in the
            dalam rangka pengembangan Perusahaan, menjamin   event of Company’s development, to ensure electricity
            ketersediaan listrik di area operasi bright PLN Batam   availability in bright PLN Batam operational area and
            dan memenuhi target KPI yang telah disusun, yang   fulfill designated KPI target, comprising of:
            terdiri dari :

                                                     Kap/
                 Proyek         Lokasi  Satuan Jumlah Unit  Total  Keterangan Progres
             No
                 Project        Location  Unit  Number Cap/ Total  Description Progress
                                                     Unit
             I   Pembangkit | Generator
             1   Studi FS &      Kijang –  MW  2      65   130  Mulai     Proses studi oleh PUSENLIS. Namun sampai
                 Pengadaan Lahan   Bintan                       Pengadaan   akhir tahun 2019 belum ada penugasan
                 PLTU di Pulau Bintan                           Juni 2019
                 FS & Land Acquisition                                    Study process by PUSENLIS. However, until the
                 Study for PLTU in                              Starting   end of 2019 there was no assignment
                 Bintan Island                                  Procurement
                                                                June 2019
             2   Program LTSA MPP   Tersebar   MW  20  25  500  19 Januari   Program LTSA MPP yang telah dilaksanakan
                 LTSA MPP program  8 Lokasi                     2019      Tahun 2019 :
                                 Spread                                   1. Pekerjaan Borescope Inspection (BSI) di
                                 over 8                         January 19,   TM#1 dan TM#4 PLTG MPP 4 x 25 MW Tarahan
                                 locations                      2019      – Lampung
                                                                          2. Pekerjaan Borescope Inspection (BSI)
                                                                          di TM#1 dan TM#3 PLTG MPP 3 x 25 MW
                                                                          Balaipungut – Duri
                                                                          3. Pekerjaan Borescope Inspection (BSI) di
                                                                          TM#1 PLTG MPP 2 x 25 MW Air Anyir – Bangka
                                                                          4. Pekerjaan Borescope Inspection (BSI) di
                                                                          TM#1 PLTG MPP 25 MW Gunung Sitoli – Nias
                                                                          5. Pekerjaan Borescope Inspection (BSI) di
                                                                          TM#1 dan TM#3 PLTG MPP 3 x 25 MW Paya
                                                                          Pasir – Medan
                                                                          6. Pekerjaan Borescope Inspection (BSI) di
                                                                          TM#1 PLTG MPP 2 x 25 Jeranjang - Lombok
                                                                          The  LTSA  MPP  program  that  has  been
                                                                          implemented in 2019:
                                                                          1. Borescope Inspection (BSI) work at TM # 1 and
                                                                          TM # 4 PLTG MPP 4 x 25 MW Tarahan - Lampung
                                                                          2. Borescope Inspection (BSI) work at TM # 1 and
                                                                          TM # 3 PLTG MPP 3 x 25 MW Balaipungut - Duri
                                                                          3. Borescope Inspection (BSI) work at TM # 1
                                                                          PLTG MPP 2 x 25 MW Air Anyir - Bangka
                                                                          4. Borescope Inspection (BSI) work at TM # 1
                                                                          PLTG MPP 25 MW Gunung Sitoli - Nias
                                                                          5. Borescope Inspection (BSI) work at TM # 1 and
                                                                          TM # 3 PLTG MPP 3 x 25 MW Paya Pasir - Medan
                                                                          6. Borescope Inspection (BSI) work at TM # 1
                                                                          PLTG MPP 2 x 25 Jeranjang - Lombok
             3   Pengadaan       Tg Balai   MW  2     5    10   Agustus   Telah dilakukan penandatanganan MOU
                 Pembangkit berbasis   Karimun                  2019      kerjasama pembangkitan berbasis LNG 10
                 LNG di sekitar                                 August 2019  MW di Tanjung Balai Karimun pada tanggal 26
                 kepulauan Riau                                           Agustus 2019

                 Procurement of LNG-                                      An MOU was signed on a 10 MW LNG-based
                 based power plants                                       generation cooperation in Tanjung Balai Karimun
                 around the Riau                                          on August 26, 2019
                 Islands
             4   Operation &     Tersebar  MW  2      50   100  2019      Proses negosiasi harga dengan PLN UIW Babel
                 Maintenance     Spread
                 Pembangkitan                                             Price negotiation process with PLN UIW Babel
                 Generation Operation
                 & Maintenance












            Laporan Tahunan | 2019 | Annual Report      391                PT Pelayanan Listrik Nasional Batam