Page 377 - GM E-Booklet Dec-2022
P. 377
PLAN HEAD - 3200 ( BRIDGE WORKS )
SN PH PROJECT PH Y-o-S PB Short Name of Work Alloc. Last Sanc Exp. upto Exp. Exp. Anti. Est. %age REMARKS Status
SN ID Item Cost March during upto TDC of Status Phy.
(PB,LB, prog
DRM) '22 2022- date Rly of Rly
2023 portion
139 1 11.03.32.18. 32 2018- - SC-DHNE:Proposed Rebuilding of existing STC RRSK 24500 3103 0 3103 31/08/ Det. Est. 2 Site clearance is in progress for casting the thrust WIP
Sanc.
4.52.001 2019 Br.No:756 at KM 617/200-300 between MJF-STPD 2023 bed. Bridge No.757 & 756 are being executed by the
as RCC Box due to Inadequate water way condition. same agency. After completion of Bridge No.757
only the Bridge No.756 will be taken up due to site
constraints. TDC 31/08/2023
140 2 11.03.32.18. 32 2018- - SC-DHNE Sec: Proposed Rebuilding of existing STC RRSK 24500 11196 0 11196 31/03/ Det. Est. 92 Work completed, Protective works and S&T works WIP
4.52.002 2019 Br.No:757 at KM 617/300-400 between MJF-STPD 2023 Sanc. are in progress. TDC:31/03/2023
as RCC Box due to Inadequate water way condition.
141 3 11.03.32.20. 32 2020- LB- HYB Division : SC-DHNE Section :- Prov. of Side RRSK 38335 0 1430 1430 31/05/ Det. Est. 10 Work awarded on 07-07-2022. TDC:31-05-2023. WIP
1.52.001 2021 523 Pathway for Bridge No.398 @ 181/350-182/300 2023 Sanc.
Sriramnagar-Gwd Stations and Bridge No. 442 @
240/800.
142 4 11.03.32.21. 32 2021- LB- SC-DHNE Section: Replacement of existing Steel RRSK 0 0 0 0 31/05/ DE under 0 Newly sanctioned work (Feb'22). WIP
4
,
B
1
O
o
n
b
N
B
r
r
B
N
GAD is under preparation. TDC:31-05-2023.
2023
o
,
N
r
o
6
2
5
3
2
2
i
r
6
G
0
5
2
1 1.52.001 1 2022 536 Girders with PSC Slab on Br NO 14,Br No 26,Br No 2 0 2 3 prep. G A D i s u n d e r p r e p a r a t i o n . T D C : 3 1 - 0 5 - 2 0 2 3 .
.
0
2
.
0
P
S
h
C
l
a
S
r
s
d
e
t
i
w
78,Br No 115 & Br No 406A.(Total 11 Spans)